INSTALLATION - STEP 8
COMPLETING THE INSTALLATION
Once you have successfully tested all the wiring and found
that everything is operational, you are ready to complete the
installation.
1) Make sure all power to the devices and terminal blocks is
off, and remove any remaining jumpers from the terminals
2) Reconnect the terminal blocks to the control by carefully
aligning them with their respective headers on the control
3) Push the terminal blocks into the headers — they should
snap firmly into place
(See fig. a)
4) Install supplied safety dividers between unpowered sensor
inputs and powered or 120 VAC wiring chambers
5) Apply power to the control
NOTE:
The operation of the control on power up is
described in the Control Function Overview section
of this manual (page 33).
Cleaning the Control
• Moisten cloth with water and wring out prior to wiping
control
• Do not use solvents or cleaning solutions on the control
23
INST
ALLA
TION
INSTALLATION - Step 8 - Completing the Installation
11
12
14
13
UnO
Sw
Com BRet
S3
Mix
S1
a
Summary of Contents for proMIX 101
Page 1: ...proMIX 101 Installation Manual...
Page 4: ...2 INTRODUCTION INTRODUCTION Control Overview...
Page 46: ...44 APPENDIX I proMIX 101 Menu Tree APPENDIX I...
Page 47: ...45 APPENDIX I proMIX 101 Menu Tree APPENDIX I...
Page 48: ...46 APPENDIX II Application Drawings APPENDIX II...
Page 49: ...47 APPENDIX II Application Drawings APPENDIX II...
Page 50: ...48 APPENDIX II APPENDIX II Application Drawings...
Page 51: ...49 APPENDIX II APPENDIX II Application Drawings...
Page 55: ......