Test The Power Supply
1) Make sure exposed wires and bare terminals are not in
contact with other wires or grounded surfaces
2) Turn on the power and measure the voltage between the
Power L and Power N terminals (3 and 4) using an AC
voltmeter, the reading should be between 108 and 132 VAC
Test The Powered Demand Inputs
Voltage Readings for Demand Devices
(described below)
1) When a demand device calls for heat, you should measure
between 20 and 260 VAC at the terminals
2) When off, you should measure less than 5 VAC
Mixing Demand
• Measure voltage between Mix Demand terminals (1 and 2)
21
INST
ALLA
TION
INSTALLATION - Step 7 - Testing the Wiring
Summary of Contents for proMIX 101
Page 1: ...proMIX 101 Installation Manual...
Page 4: ...2 INTRODUCTION INTRODUCTION Control Overview...
Page 46: ...44 APPENDIX I proMIX 101 Menu Tree APPENDIX I...
Page 47: ...45 APPENDIX I proMIX 101 Menu Tree APPENDIX I...
Page 48: ...46 APPENDIX II Application Drawings APPENDIX II...
Page 49: ...47 APPENDIX II Application Drawings APPENDIX II...
Page 50: ...48 APPENDIX II APPENDIX II Application Drawings...
Page 51: ...49 APPENDIX II APPENDIX II Application Drawings...
Page 55: ......