8
Installation
IMPORTANT! Do not install this system
in the rain, or under any wet conditions
. Mois-
ture may affect electronics and void your
warranty!
1. For best performance and to reduce signal ac-
quisition time, park vehicle on a level surface; level
the RV.
2. Select a level spot on your roof for installation.
Using the chart,
determine the
minimum
distances
to other equipment.
WARNING:
Level the base front to back and
side to side. If base is not level the MV-4002 may
require more time to locate the correct satellite
or may not locate the correct satellite.
• Be sure no roof-mounted equipment is
blocking the satellite “line of sight”, Fig. 3
• You will need to decide where the wires will enter
the vehicle. A coax and a power wire (minimum 16
gauge) will need to be run into the vehicle.
WARNING: Many +12VDC sources can cause the unit
to fail. Select a filtered source, preferably a dedi-
cated line to the battery.
!
Install in DRY conditions only!
Installing unit on roof of vehicle —
Obstruction Ht.
Unit Clearance
8” .......................................... 4”
10” ................................... 11.5”
12” ...................................... 19”
15” ...................................... 32”
3. Remove dome. Place dome in safe spot to avoid
damage. Place base on vehicle roof in the location
selected.
4. Attach each mounting foot to base by securing
with two 7/16” nylocks. See page 7 for foot locations.
5. After selecting location for unit (see number 2),
put the unit on the centerline of the vehicle.
REAR MOUNTING FOOT MUST BE PARALLEL
WITH THE CENTER LINE OF VEHICLE.
See pg. 7.
6. Place the unit on the roof in its permanent loca-
tion and mark around the base bracket, Figure 4.
(Make sure the
rear adjustable base foot is par-
allel with the center line of the vehicle
. Refer
to page 3, Figure 1A ).
8. Put approved sealant in the areas marked
for the base feet. Place base feet on top of the
sealant and screw down with the (4) #10
screws (provided) for each foot.
9. After all base feet are secured to roof, put
sealant around edge of feet and over screws.
Replace base on screws and reinstall nut.
7. Clean roof area where the base feet will be at-
tached to the roof. Do not erase your marks!
FIGURE 4
FIGURE 3
OBSTRUCTION
UNIT BASE
FIGURE 5
BASE EXTERIOR