21
2.8 Storing the instruction booklets
Store all the instruction booklets carefully. The best place is in the folder provided in the hanger – Fig. 39.
For the Installer
2.9 Initial start-up and operating instructions
Windhager Customer Service or the customer service partner will start up the boiler first of all, and will famil-
iarise the customer with the system operation and cleaning of the boiler, with reference to the Operating Man-
ual.
Please note: Do not heat up first – Start-up and maintenance are part of the guarantee requirements of the “war-
ranty conditions”.
The following preconditions must be met before you order the initial start-up:
1.) Boiler installed correctly.
2.) System fully wired up electrically.
3.) System rinsed, filled and sufficient heat consumption must be possible.
4.) Boiler connected to domestic water and filled.
5.) Sufficient quantity of fuel available (pellets, oil, gas, slit logs).
6.) The customer must be present during start-up.
The initial start-up cannot be carried out if any one of these points is neglected. The customer will be charged
for any unnecessary costs arising as a result.