12
For the Installer
2.5 Installing the cladding
4
3
2
1
5 6 7 8
9
10
11
12
13
14
15
16
17
18
20 19
22 21
1
Cladding door
2
Cladding door cover
3
InfoWIN
4
Left side panel
5
Cover for cladding door switch
6
Control panel complete
7
Front boiler cover
8
Rear boiler cover
9
Connecting bracket cladding
(for LWP 360 – 500 only)
10
Top insulation
11
Insulation flue outlet
12
Retaining bracket for blower
plug
13
Rear wall top
14
Rear wall bottom
15
Air control
16
Lever for cleaning heating sur-
faces
17
Hanger
18
Side panel right
19
Magnetic catch (2 pcs.)
20
Hook-in plate ash pan
21
Bracket for door hinges (2 pcs.)
22
Door hinge (2 pcs.)
Fig. 7
Insulation and cladding parts
All cladding parts must be fitted in full for air guidance and the dissipation of heat on the boiler.
The cladding comprises the following parts: