2
60706-209/I
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
2
SAFETY 3
SPECIFICATIONS 4
GENERATOR
ENGINE
INTRODUCTION 5
TESTING POLICY
PRODUCT DESCRIPTION
PREPARING THE UNIT
6
UNPACKING
LUBRICATION
OIL RECOMMENDATIONS
INSTALLATION 7
GENERATOR CLEARANCES
ENGINE-GENERATOR SET MOUNTING
FUEL INSTALLATION
LIQUID PROPANE VAPOR (LP)
NATURAL GAS (NG)
FUEL PRESSURE
FUEL PRESSURE TABLES
NG/LP FUEL CONVERSION
LUBRICATION
OIL RECOMMENDATIONS
OIL ALERT SYSTEM
INSTALLING THE BATTERY
11
SERVICING BATTERIES
BATTERY CHARGING
CONNECTING THE BATTERY CHARGER
SOLAR CHARGER OPTION
GENERATOR CONNECTIONS
WINCO UL ATS (ASCO 185)
AC ELECTRICAL CONNECTIONS
13
DC ELECTRICAL INTERCONNECTION 14
ASCO 185 UL SWITCH
INITIAL START UP
15
START UP PROCEDURE
CUSTOMER CONNECTION AREA
SEQUENCE OF OPERATION
19
DSE 3110
20
FRONT PANEL CONFIGURATION
ACCESSING THE FRONT PANEL
EDITING A PARAMETER
DSE 3110 FAULT CODES
DSE 3110 ENGINE CONTROL
MODULE DISPLAY
AUTOMATIC TRANSFER SWITCH
ENGINE-GENERATOR SET
PREVENTATIVE MAINTENANCE
22
TROUBLE SHOOTING TABLES
23
PAD LAYOUT DRAWING
24
AC AND DC GENERATOR SCHEMATIC 25
AC WIRING SCHEMATIC
25
SOLAR CONTROL PANEL
26
EXTERNAL RECEPTACLE ASSEMBLY 26
SOLAR PANEL ASSEMBLY
27
12 MONTH LIMITED WARRANTY
28
LIMITED WARRANTY
28
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should
be followed during installation and maintenance of the
generator. Read and understand all instructions in the
manual before starting and operating the generator.
USING THIS MANUAL
Congratulations on your choice of a WINCO generator.
You have selected a high-quality, precision-engineered
generator designed and tested to give you years of
satisfactory service.
To get the best performance from your new generator, it is
important that you carefully read and follow the operating
instructions in this manual.
Should you experience a problem please follow the
“Troubleshooting Tables” near the end of this manual.
The warranty listed in the manual describes what you can
expect from WINCO should you need service assistance in
the future.