INITIAL START UP

WARNING:

DO NOT jump start these engine generator sets. Starting 

these units on a low battery of jump starting them will 

cause damage to the engine control module.

Use the following checklist to verify correct installation 

before starting the engine:

 

 Engine oil.* Check level & fill as required with proper 

   grade/quantity.

 

 Unit mounting base properly bolted down.

 

 Clearance for service and maintenance on all sides.

 

 Proper fuel line material and size.

 

 All fuel line connections tight. 

 

 Fuel line protected and a moisture trap installed

      (may be required for NG).

 

 LP/NG pressure OK. 4-6 oz. (7-11 in. WC).

 

 Battery connections clean and tight.

 

 Battery fully charged. 

 

 All AC and DC wiring installed and properly 

   protected.

* Refer to engine owners manual for proper levels and 

types.

After completing the above checklist, the engine generator 

set is ready for the initial start-up test.

START UP PROCEDURE

ENGINE-GENERATOR SET ONLY

The engine control module (ECM) is manufactured by Deep 

Sea Electronics. Model 3110 is used on this generator set. 

See following picture and look for more information stated 

within this manual.

MANUAL OPERATION

Press and release the red Stop/Reset button. Then press 

and release the green Start Engine button. The engine-

generator will crank and start automatically. If the engine 

fails to start, reference the fault codes to correct the problem 

before proceeding.

10

REV B

60706-229

DC ELECTRICAL INTERCONNECTION

CAUTION:

Never run the AC and DC wiring on the same conduit.

ASCO 185 UL SWITCH

Your DC connection points in the ASCO 185 UL ATS are on the 

terminal block on the bottom of the controller in the lower left hand 

corner of the ATS panel. The terminal block (TB7) is numbered 1 

through 9. These terminals will accept # 22 - # 14 AWG stranded wire. 

It is recommended that you use # 16 AWG for distances up to 200 

feet. You need to run two (2) wires from the engine generator set to the 

transfer switch. You will be using terminals 4 and 5, wire Start # 23 will 

connect to terminal # 5 and wire Battery Negative # 1 will connect to 

terminal # 4. See the following table and illustration.

Wire #

Purpose

Recommended Color

#23

Start

Black

#1

Battery negative

White

INITIAL START UP

WARNING:

DO NOT jump start these engine generator sets. Starting these units 

on a low battery of jump starting them will cause damage to the engine 

control module.

Use the following checklist to verify correct installation before starting 

the engine:

Ƒ(QJLQHRLO&KHFNOHYHO ¿OODVUHTXLUHGZLWKSURSHU

   grade/quantity.

Ƒ8QLWPRXQWLQJEDVHSURSHUO\EROWHGGRZQ

Ƒ&OHDUDQFHIRUVHUYLFHDQGPDLQWHQDQFHRQDOOVLGHV

Ƒ3URSHUIXHOOLQHPDWHULDODQGVL]H

Ƒ$OOIXHOOLQHFRQQHFWLRQVWLJKW

Ƒ)XHOOLQHSURWHFWHGDQGDPRLVWXUHWUDSLQVWDOOHGPD\EH

 

  required for NG).

Ƒ/31*SUHVVXUH2.R]LQ:&

Ƒ%DWWHU\FRQQHFWLRQVFOHDQDQGWLJKW

Ƒ%DWWHU\IXOO\FKDUJHG

Ƒ$OO$&DQG'&ZLULQJLQVWDOOHGDQGSURSHUO\SURWHFWHG

* Refer to engine owners manual for proper levels and types.

After completing the above checklist, the engine generator set is ready 

for the initial start-up test.

START UP PROCEDURE

ENGINE-GENERATOR SET ONLY

The engine control module (ECM) is manufactured by Deep Sea 

Electronics. Model 3110 is used on this generator set. 

See following picture and look for more information stated within this 

manual.

MANUAL OPERATION

Press and release the red Stop/Reset button. Then press and release 

the green Start Engine button. The engine-generator will crank and 

start automatically. If the engine fails to start, reference the fault codes 

to correct the problem before proceeding.

generator under load. Should you ever have to work on the switch, 

you will be able to disconnect the power and work on the switch cold 

without having the power company pull your meter.

7RZLUHWKHDXWRPDWLFWUDQVIHUVZLWFKLQWRWKHH[LVWLQJZLULQJ¿UVW

determine which circuits will be on the emergency load circuit. If the 

entire load is to be transferred, the transfer switch can be wired in 

directly after the watt-hour meter and the service entrance, providing 

WKHVHUYLFHHQWUDQFHDPSHUHUDWLQJLVZLWKLQWKHWUDQVIHUVZLWFK¶VUDWHG

capability. 

,IRQO\VSHFL¿FFLUFXLWVDUHWREHSRZHUHGXQGHUHPHUJHQF\SRZHU

failure conditions, an additional distribution panel designated 

“emergency distribution panel” must be installed.

All selected emergency circuits are removed from main distribution 

panels and reinstalled in the emergency distribution panel. Suggested 

circuits: freezer, refrigerator, furnace, emergency lights, sump pump, 

emergency outlet circuits, etc. Total running load must not exceed 

generator rating.

STOP/RESET (red button) - This button places 
the module into its Stop/Reset mode. This 
will clear any alarm conditions for which the 
triggering criteria have been removed. The 
fuel supply de-energizes and the engine comes 
to a standstill. Should a remote start signal be 
present while operating in this mode, a remote 
start WILL NOT occur.
AUTO (white button) - This button places the 
module into its Automatic mode. This mode 
allows the module to control the function of 
the generator automatically. The module will 
monitor the remote start input and once a start 
request is made, the set will be automatically 
started and placed on load. The module  will 
then wait until the next start event.
START (green button) - Pressing this button 
from STOP/RESET will start the engine and run 
the load. 

PAGE - Pressing this button scrolls the display to 
show the various instruments. 

With the engine running soothly, check the no load voltage 

and frequency wire #1 and #4 on the generator terminal 

block in the ATS (L2 and L6 in the ASCO ATS). The voltage 

should be 240 Volts plus or minus nominal. The frequency 

should be between 61.5 to 62 Hertz (Hz). The Voltage 

should also be checked between the hot terminals (L2 and 

L6) and the neutral connection. The Voltage should be 

about one half of the line to line Voltage. 

OPERATING SPEED

The engine-generator must be run at the correct speed 

in order to produce the proper electrical voltage and 

frequency.

The speed of the engine was carefully adjusted at the 

factory so that the generator produces the proper voltage 

and frequency. For normal usage, the speed setting should 

not be charged. If the generator is being run continuously 

on a very light load, it is often advisable to lower the 

operating speed slightly. 

CAUTION: EQUIPMENT DAMAGE

SPEED ADJUSTMENTS SHOULD ONLY BE MADE BY A 

QUALIFIED SERVICE TECH. 

NOTICE:

If for any reason during the check out procedures the 

Voltage and frequency are not correct, press the red Stop/

Reset button and correct the trouble before proceeding.

After verifying the Voltage and frequency are not correct, 

press the Stop/Reset button. This will shut off the engine 

immediately.

Summary of Contents for PSS12H2W/E

Page 1: ... need to contact us on this unit it will help us to respond to your needs faster MODEL __________________________________________________ SERIAL NUMBER _________________________________________ PURCHASE DATE _________________________________________ DEALER NAME ___________________________________________ DEALER PHONE ________________________________________ 16200 006 www wincogen com ...

Page 2: ...Y AUTOMATIC TRANSFER SWITCH ENGINE GENERATOR SET PREVENTATIVE MAINTENANCE 22 TROUBLE SHOOTING TABLES 23 PAD LAYOUT DRAWING 24 AC AND DC GENERATOR SCHEMATIC 25 AC WIRING SCHEMATIC 25 SOLAR CONTROL PANEL 26 EXTERNAL RECEPTACLE ASSEMBLY 26 SOLAR PANEL ASSEMBLY 27 12 MONTH LIMITED WARRANTY 28 LIMITED WARRANTY 28 SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followe...

Page 3: ...at must be mixed with fresh air A Operate only in well ventilated areas B Never operate indoors including attached garages C Never operate the unit in such a way as to allow exhaust gases to seep back into closed rooms i e through windows walls floors WARNING FIRE HAZARD Gasoline and other fuels present a hazard of possible explosion and or fire A Do not refuel when the engine is running or hot B ...

Page 4: ...40 feet elevation above sea level FUEL CONSUMPTION Natural Gas 1000 BTU FT LP Vapor 2520 BTU FT CF HR 194 75 4 BTU HR 194 000 190 000 GAL HR N A 2 1 Based on full load operation LP TANK SIZING Tank Temperature Tank Size 60 F 16 C 150 Gallons 32 F 0 C 250 Gallons 0 F 18 C 500 Gallons 20 F 29 C 1000 Gallons ENGINE Make Honda Model GX690 Displacement 688 CC OHV Cylinders Sleeves V Twin Cast Iron Igni...

Page 5: ...ard equipment The ATS also contains the power failure sensing circuitry necessary to start and stop the engine generator set The transfer switch is also equipped standard with a 3 second start delay and a 15 second transfer delay to allow the engine to warm up before transferring the load to the generator When the line power is restored the ATS has a 5 minute transfer delay to allow the incoming u...

Page 6: ... Allow the used oil to drain completely then reinstall the drain bolt and new sealing washer and tighten the drain bolt securely Please dispose of used motor oil in a manner that is compatible with the environment We suggest you take used oil in a sealed container to your local recycling center or service station for reclamation Do not throw it in the trash pour it on the ground or pour it down a ...

Page 7: ...supplier or building inspector INSTALLATION GENERATOR CLEARANCES These units should be mounted a minimum of 24 from a structure This will allow for ample room to maintain and work on the generator set Units must be installed in accordance with all local state and national codes Consult your local agency for specific requirements DANGER DEADLY EXHAUST GAS Carbon monoxide CO is an orderless deadly g...

Page 8: ...eet from the primary to the low pressure regulator Consult your local fuel supplier for your exact requirements The appropriate line size from the following table is then installed from the low pressure regulator to the generator set Feet Size of pipe Up to 25 ft pipe 25 100 ft 1 pipe Over 100 ft Use a two regulator system Allow an additional 3 feet for each standard elbow DO NOT use street ells r...

Page 9: ...oad Line PSI 10 15 lbs 7 11 in 4 6 oz 7 11 in 4 6 oz Full load Line PSI 10 15 lbs 7 11 in 4 6 oz 7 11 in 4 6 oz Natural gas Ref 2 3 4 Unit off 2 PSI 7 11 in 4 6 oz 7 11 in 4 6 oz Starting 2 PSI 7 11 in 4 6 oz 7 11 in 4 6 oz No load 2 PSI 7 11 in 4 6 oz 7 11 in 4 6 oz Full load 2 PSI 7 11 in 4 6 oz 7 11 in 4 6 oz NG LP FUEL CONVERSION These generator sets are factory tested on NG and will require n...

Page 10: ...dd oil to the system The necessity of using the correct oil and keeping the crankcase full cannot be overemphasized Engine failures resulting from inadequate or improper lubricant are considered abuse and not covered by the generator or engine manufacturer s warranty OIL RECOMMENDATIONS Outdoor temperatures determine the proper oil viscosity for the engines Winco recommends our 5W 30 fully synthet...

Page 11: ...ttempting to start INSTALLING THE BATTERY CAUTION In the following battery installation procedure check to be sure the selector switch remains in the off position This should be your last step before initial start up A customer supplied twelve volt battery is required to complete the installation Installation of the highest CCA rated battery within the correct BCI group size will increase cold wea...

Page 12: ...this circuit be fused for 15 Amps Terminal block connections have been provided in the customer connection area of the engine generator set See following diagram NOTICE The battery tender is not intended to recharge a battery which has become completely discharged It is designed to produce enough current to recharge a slightly low battery and maintain a fully charged battery SOLAR CHARGER OPTION I...

Page 13: ...d emergency distribution panel must be installed All selected emergency circuits are removed from main distribution panels and reinstalled in the emergency distribution panel Suggested circuits freezer refrigerator furnace emergency lights sump pump emergency outlet circuits etc Total running load must not exceed generator rating NOTICE CLASS 1 WIRING METHODS ARE TO BE USED FOR ALL FIELD WIRING CO...

Page 14: ... through 9 These terminals will accept 22 14 AWG stranded wire It is recommended that you use 16 AWG for distances up to 200 feet You need to run two 2 wires from the engine generator set to the transfer switch You will be using terminals 4 and 5 wire Start 23 will connect to terminal 5 and wire Battery Negative 1 will connect to terminal 4 See the following table and illustration Wire Purpose Rec...

Page 15: ...ctured by Deep Sea Electronics Model 3110 is used on this generator set See following picture and look for more information stated within this manual MANUAL OPERATION Press and release the red Stop Reset button Then press and release the green Start Engine button The engine generator will crank and start automatically If the engine fails to start reference the fault codes to correct the problem be...

Page 16: ...TARTING CONTACTS Disconnect the generator battery Connect the generator starting wires 1 battery to terminal 4 wire 23 start to terminal 5 of the TB7 terminal block This is removable for convenient connections GENERATOR EXERCISER CIRCUIT The automatic generator exerciser is configured to automatically exercise the generator for 20 minutes once every week In order to set and test the exercise circu...

Page 17: ...r The status light below the button blinks during the exercise period including cool down The light stays on to indicate that the exerciser has been set If the light is off the exerciser has not been set CANCELING AN ACTIVE EXERCISE PERIOD Press the Bypass Time Delay button to stop an exercising generator If exercise with load is set the ATS retransfers the load to the utility then stops the gener...

Page 18: ...TY LINE TO POWER BATTERY TENDER AND OPTIONAL ENGINE HEATER CUSTOMER GENERATOR OUTPUT CONNECTIONS TO EMERGENCY TRANSFER SWITCH EMERGENCY STOP CONTACTS PROVIDED FOR REMOTE EMERGENCY STOP SWITCH UNIT WILL NOT RUN IF JUMPER IS REMOVED BATTERY TENDER CUSTOMER EARTH GROUND CONNECTED HERE AS REQUIRED TORQUE TO 16 IN LBS RATED FOR 4 TO 10 AWG WIRE 85 AMPS TORQUE SCREWS TO 9 6 IN LBS 14 TO 16 AWG COPPER WI...

Page 19: ...19 60706 209 I SEQUENCE OF OPERATION UTILITY FAILURE ...

Page 20: ...CODES Auxiliary inputs can be user configured and will display he message as written by the user Fail to Start The engine has not fired after the preset number of start attempts Fail to Stop The module has detected a condition that indicates that the engine is running when it has been instructed to stop NOTE Fail to Stop could indicate a faulty oil pressure sensor If engine is at rest check oil se...

Page 21: ... The fault must be removed and the Stop Reset button pressed to reset the module The icon will appear flashing in the display MODULE DISPLAY TIMER ICON When the module is controlling the engine starting and stopping an animated timer icon will be displayed in the icon area to indicate that a timer is active For example cranking time crank test etc STOPPED ICON When there are no alarms present an i...

Page 22: ...n and not burned or pitted ENGINE GENERATOR SET Service the engine in accordance with the engine manufacturer s manual provided with your new equipment Routinely remove debris and dirt from around the inside generator enclosure Ensure that the air intakes are free from leaves and other debris at all times Clean and inspect battery terminals at least twice a year Also check the battery water level ...

Page 23: ...ator set 9 Defective starter fuel solenoid relays ENGINE CRANKS BUT WILL NOT START 1 Improper fuel pressure being delivered to unit 2 Fuel supply shut off 3 Fuel supply empty 4 Defective spark plug 5 Defective engine ignition module 6 Dirty air cleaner filter 7 Defective fuel solenoid valve 8 Low Voltage from battery to fuel solenoid must hold 12 Volts during cranking 9 Oil in the bottom of the ai...

Page 24: ...24 60706 209 I PAD LAYOUT DRAWING 21 11075 01 60706 209 ENGINE GENERATOR SET PAD LAYOUT ...

Page 25: ...IONS ASCO 165 SERIES TRANSFER SWITCH 9 8 7 6 5 4 3 2 1 TB7 L6 NEUTRAL T B 4 3 2 1 L2 GROUND T B 9 POSITION CONNECTOR G1 N G3 GND N L1 GND 1 5 24 23 ES ES 2 4 1 24 22 1 23 CONTROL TOWER ENGINE CONTROLLER 24 1 21 4 22 1 96 4 MLCB CR 1 CR 2 SC 1 3 4 9 8 5 2 EXCITATION CAPACITOR GENERATOR BATTERY FSS FS SM SC OLS EC BC TO RECEPTACLE ON CONTROL TOWER 1 2 3 4 8 9 15 14 10A G1 N DEEP SEA 3110 2A 13 12 OT...

Page 26: ...26 60706 209 I SOLAR CONTROL PANEL IF EQUIPPED EXTERNAL RECEPTACLE ASSEMBLY IF EQUIPPED N N GND GND G1 G1 G3 G3 G3 G3 ...

Page 27: ...27 60706 209 I SOLAR PANEL ASSEMBLY IF EQUIPPED ...

Page 28: ... does not cover travel time mileage or labor for removal or re installation of WINCO product from its application Normal wear and tear Costs of rental equipment WINCO does not warrant engines Engines are covered exclusively by the warranties of their respective manufacturers WINCO does not warrant component parts that are warranted by their respective manufacturers WINCO does not warrant modificat...

Reviews: