Installation and operating instructions Wilo-Port 800 51
INSTALLATION English
5.2.11. Installing the pump cover
WARNING! Danger of injury!
Personnel can fall into the open pump chamber and suffer seri-
ous injuries. Always keep the pump chamber sealed and ensure
that the pump cover is fitted securely.
Dimensions
Class in accordance with EN 124
Dimensions
A15
Ø785x80 mm
B125
Ø750x120 mm
D400
Ø785x160 mm
The pump cover is fitted in the cover flange with the cover frame
(maximum outer diameter 825 mm).
Ensure that it is seated centrally.
To ensure secure and full-faced contact in the cover flange, a thin
layer of mortar should be applied. Fill the gap between the pump
cover and the cover flange with mortar or an equivalent material.
5.2.12. Final tasks
A flush connection can be installed for flushing the pressure pipe
using compressed air or water pressure. In addition, a vacuum relief
valve can be installed to protect against the pump chamber being
drained dry. Both of these components are available as accessories.
Flush connection
Fig. 14: Flush connection installation
1 Surface coupling
4 Flush connection extension
(L = 300 mm)
2 Gate valve
5
Flush connection
(L = 300 mm)
3
Flush connection (1")
6
Flush connection cover (dummy
coupling Storz C-52)
The flush connection is installed directly on the surface coupling.
The inlet is connected using a Storz coupling C-52.
1. Remove the sealing plug on the 1" connection on the surface cou-
pling.
2.
Wrap the thread on the flush connection with a standard sealant
(hemp, Teflon tape).
3.
Screw the flush connection into the connection on the surface
coupling.
4. To connect the inlet, remove the dummy coupling on the flush con
-
nection and connect the inlet.
If the flush connection is positioned too low, it can be adjusted using
an extension. A corresponding number of extensions can be screwed
into one another depending on the required height.
Each thread connection must be sealed using a standard sealant
(hemp, Teflon tape).
1
2
4
5
6
3
Fig. 14