Installation and operating instructions Wilo-Port 800

 

45

INSTALLATION English

Select the appropriate groove using the following table:

Groove Extension in mm

(from top edge of pump chamber to top edge of extension)

3

200

4

250

5

300

6

350

7

400

8

450

9

500

Grooves 1, 2 and 10 may not be used.

3. 

Insert the O-ring supplied in the selected groove in the extension.

4. 

Coat the O-ring and the inside of the taper on the pump chamber 

with lubricant (washing-up liquid or even water in an emergency).

5. 

Slide the pump chamber extension into the pump chamber until the 

O-ring wedges securely in the cone in the taper.

Do not push the O-ring beyond the cone. Make sure that the 

O-ring slides cleanly into the taper, does not twist and is not 

pushed out of the groove. If necessary, push the O-ring further by 

hand when fitting the extension.

Concrete adjusting rings

Fig. 6: Installing concrete rings 

1

Cover flange

4

Pump cover with frame

2

Filling (sand or mortar)

5

Filling / compacting layer

3 Concrete adjusting rings

6 Surface level substructure

Standard concrete adjusting rings can be used for height compen-

sation to the surface level, up to a maximum of 200 mm above the 

top edge of the pump chamber including the pump cover height. 

The concrete rings should be provided by the customer.

1. 

1. Place the concrete ring centrally on the cover flange

2. 

Fill the gap between the concrete ring and the cover flange with 

sand or mortar.

3.  Place further concrete rings centrally. 

To ensure a solid and full-faced contact between the concrete rings 

and the cover frame and to minimise additional water ingress by 

ground water or surface water, a thin layer of mortar must be applied 

to the mating surfaces on the concrete rings and the cover frame.

5.2.6.  Installing the pump chamber extension – When using D400 pump 

cover

CAUTION! 

The max. installation depth of 2750 mm including load distribu-

tion plate, concrete adjusting rings and pump cover may not be 

exceeded. Otherwise, deformation or cracks in the body of the 

pump chamber could occur.

CAUTION! 

When using the load distribution plate, absolute impermeability 

to the interior of the pump chamber is not achieved. This can 

lead to increased ingress of water into the pump chamber at 

a high ground water level. In turn, this can overload the pump 

and cause consequential damage to the pumping station.

1

4

6

5

max. 200

3

2

Fig. 6

Summary of Contents for Wilo-Port 800

Page 1: ...de instalaci n y funcionamiento no Monterings og driftsveiledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje hr Upute za ugradnju i uporabu sr Uputstvo za ugradnju i upotrebu sl Navod...

Page 2: ...ntended use and fields of application 36 3 2 Improper use and fields of application 36 3 3 Set up 37 3 4 Function description 37 3 5 Materials 38 3 6 Technical data 38 3 7 Type key 38 3 8 Dimensions 3...

Page 3: ...supervised by a person responsible for their safety and have received instructions from that person on how the pump chamber is to be used Children must be supervised to ensure that they do not play wi...

Page 4: ...ng apply Inadequate configuration by the manufacturer due to the infor mation provided by the operator or customer being insufficient or incorrect Non compliance with safety instructions and working i...

Page 5: ...hen installing and removing the pump chamber A second person must always be present Adequate ventilation must be ensured when working inside the pump chamber All work assembly dismantling maintenance...

Page 6: ...ump and how to shut it off For the connection refer to the operating and maintenance manual for the pump installed The pump installed must always be earthed 2 4 Safety and monitoring equipment The pum...

Page 7: ...quality assurance Fault free operation is guaranteed if it is installed and maintained correctly 3 1 Intended use and fields of application RISK of explosive atmosphere Sewage containing faeces can le...

Page 8: ...ater in Germany in accordance with DIN 1986 3 3 3 Set up Fig 1 Overview 1 Pump chamber 9 Inlet connection 2 Discharge pipe 10 Venting cable ducts 3 Non return ball valve 11 Pump 4 Surface coupling 12...

Page 9: ...0 Ventilation connection cable bushing 1x DN 100 Max permitted ambient temperature 20 C Ground below depth of 0 5 m Max permitted ground water level Ground level Impoundment volume See data sheet cata...

Page 10: ...n materials for pumps Installation and operating instructions NOTE For use as a pumping station accessories are required that have to be ordered separately 3 10 Accessories Clamp bolting for connectio...

Page 11: ...for storage Place the pump chamber securely on a solid bearing surface and secure it against falling over or sliding away Pump chambers are stored vertically DANGER due to falling over Never set down...

Page 12: ...ing installa tion and suffer serious injuries During installation the installation location must be appropriately marked and secured Always close the installed pump chamber with an appropriate pump co...

Page 13: ...0 mm Max height adjustment with plastic pump chamber extension 500 mm CAUTION The pump chamber may not be installed in peaty ground This can lead to destruction of the pump chamber Pump cover Must be...

Page 14: ...engineering and road building slope angle installation If required due to the groundwater level the pit must be protected using a groundwater drawdown NOTE If a class D400 pump cover is to be used a l...

Page 15: ...roof routing 4 Perform a leak test in accordance with the applicable regulations 5 2 5 Installing the pump chamber extension When using A15 and B125 pump cover CAUTION The max installation depth of 27...

Page 16: ...ed for height compen sation to the surface level up to a maximum of 200 mm above the top edge of the pump chamber including the pump cover height The concrete rings should be provided by the customer...

Page 17: ...mp chamber must be continuously checked for a plumb vertical and constant position and for any deformation or other indications of installation errors The areas directly adjacent to the pump chamber w...

Page 18: ...content grain size 0 32 mm as far as the base of the substructure and compact properly Dpr 97 Compact by hand at the pump chamber wall ensuring that the pump chamber is in a plumb vertical position a...

Page 19: ...ff device Suspend the chain from the discharge pipe observing the separate installation and operating instructions for the chain and lower the pump and discharge pipe into the pump chamber until the t...

Page 20: ...t can be vented Alternatively a bubbling through system can be used In this case a small compressor continuously pumps air into the dynamic pressure bell In addition we recommend installation of an ad...

Page 21: ...e 120 120 120 120 Switching point C Set Pump off signal when using dynamic pressure bell and level sensor then set follow up time up to dimension A pump off set follow up time if there is no inlet If...

Page 22: ...lve can be installed to protect against the pump chamber being drained dry Both of these components are available as accessories Flush connection Fig 14 Flush connection installation 1 Surface couplin...

Page 23: ...ired by the operating personnel for safe commissioning and operation of the pump chamber The following general conditions must always be met and checked The maximum inflow must be lower than the maxim...

Page 24: ...al regulations are met Check that all required components and connections inlet dis charge pipe with shut off device venting electrical connection are present and properly installed 1 Open the pump co...

Page 25: ...health must be decon taminated after being lifted out of the pump chamber before any other work is carried out Otherwise there is a risk of death Wear the necessary physical protection equipment BEWAR...

Page 26: ...l substances Toxic or harmful substances in sewage pump chambers can lead to infections or suffocation The installation location must be adequately ventilated before all work Appropriate protective eq...

Page 27: ...s Faults may only be repaired by qualified specialist personnel Observe the installation and operating instructions for the pump level control device and other accessories If the operating fault canno...

Page 28: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: