- 14 -
14. COMMISSIONING
- Open all the valves in the pipe.
- In order to switch off the electric power, wait until the self-priming process is finished.
This will last 5-8 minutes. If the non-return valve has been installed, the pump should
prime water at once when the inlet pipe is filled with water.
- If the pump could not start or prime water, please refer to Section 16 “Faults, causes and
remedies”.
Figure 3
Inlet pipe mustn‘t
be posioned higher
than the pump inlet
WARNING
2
3
5 - 8 minutes
Figure 4
1
Injection hole
Summary of Contents for PW BOOST INITIAL 250EA
Page 75: ......