9.5.4 MOUNTING INSTRUMENT WITH JUNCTION BOX 

Versions with junction box have three cable entries, a terminal 
block with three/six terminals, a terminals identification plate, an 
internal and external grounding connections. 
The terminals are identified as follows: 

Identification No. 

Function 

Micro No. 

Common 

Normally Open 

Normally Closed 

Common 

Normally Open 

Normally Closed 

 

Mounting with cable protected in metal tube is to be carried out 
so as to prevent possible condensate from entering the junction 
box. 
The junction box is to be surface mounted using the bracket 
suppiled with it. 

Warning: 

Instruments with aluminium enclosure. The 

instrument must be protected against accidental impacts of the 
housing. 
The  instrument  is  supplied  with  two  protective  earthing 
connections, one inside and one outside the enclosure. 
The connection provide effective connection of a conductor with 
a cross-sectional area of at least 4 mm

2

 

CAUTION:

  fittings  used  for  the  electrical  connection  of  the 

flameproof instruments shall be certified according the IEC or EN 
standards  and  shall  guarantee  instrument  degree  of  protection 
(IP66) 

 

CAUTION: 

cable entries not used 

must 

be plugged and sealed 

with the plugs provided so as to prevent raining water or other 
from  entering  the  junction  box. 

In  case  of  flameproof 

instruments  these  plugs,  if  not  correctly  mounted  and 
blocked  to  prevent  their  removal,  do  NOT  guarantee  the 
mode  of  protection  Ex-d

.  Furthermore,  in  order  to  guarantee 

the degree of protection IP65 and the non-loosening of Conduit 
Seal  or  packing  gland, 

it  is

 

prescribed

  to  seal  the  threads  of 

connection with the same anaerobic sealant used for the plugs. 
For instance, a sealant like Loctite ® 648 can be applied on the 
thread of plugs, Conduit Seal or packing gland before screwing 
them on the box. 

 

9.6  WIRING 

The  multicore  cable  used  for  electric  wiring  has  a  7  mm  OD 
silicone sheat for one contact versions, 8 mm OD for two contact 
versions. Each wire has a section of 0,5 mm

2

 (20 AWG) and is 

silicone insulated. Wires ends are factory tinned. The colour of 
insulator defines the contact function (see Fig. 4 and stampings 
on slot cover). 

Before  starting  wiring,  check  that  electric  lines  are  not 
powered. 

The  instrument  is  to  be  grounded 

according  to  applicable 

electrical  codes

.  Make  use  of  the  internal  yellow-green  wire 

and,  if  the  cable  is  not  protected  by  metal  tubing,  connect  the 
external  screw  of  the  groundig  device  supplied  with  the 
instrument. 
Should the instrument be fitted with junction box, make sure that 
no deposits or wire ends remain inside the box. Tightening and 
blocking the cover as the wiring of the junction box is finish. 

Warning:

 The intrinsic safety instrument may be equipped with 

micro switches SPDT or DPDT. All the electrical connection must 
be part of intrinsically safe circuits. The entry parameters relevant 
for intrinsic safety are listed on the nameplate of the instrument. 

10 -  PUTTING INTO OPERATION 

The instrument starts operating as soon as is energized. 

11 -  VISUAL INSPECTION 

Periodically check the external condition of the enclosure. 
In case of flameproof or intrinsic safety instruments, inspections 
of the electrical installation are to be carried out also according 
to customer procedures and at least in accordance with Standard 
IEC/EN-60079-17. 
The flameproof and the intrinsic safety instruments, installed in 
explosive atmospheres for the combustible dust presence, must 
be  periodically  cleaned  up  externally  in  order  to  avoid  dust 
accumulating. 

12 -  FUNCTIONAL VERIFICATION 

This  will  be  carried  out  according  to  the  Customer’s  control 
procedures and as minimum yearly if used as an alarm of max 
temperature. 
The

 

instruments  can  be  verified  on  the  plant  if  installed  as 

illustrated in Fig. 11,12 and 13.  
To avoid any risk it is recommended check the set point on site 
without open the cover of the junction box, without dismount the 
cable gland, without unplugging the power cable.  
The flameproof  or intrinsic safety instruments may be checked 
on site only if apparatus suitable for explosive atmosphere are 
used. 
If this is not the case it is necessary remove the instrument from 
the plant and carry out the verification in a testing room. 
If  the  verification  of  the  set  point  is  performed  unplugging  the 
power cable from the terminal block it is recommended power off 
the instrument to avoid any electrical hazard 

WARNING:

 

Instrument models TXA, flameproof.

  

Before  open  the  cover  of  the  junction  box  or  the  cable  gland 
check the absence of explosive atmosphere and check that the 
instrument is 

de energized

 

Verification consists in 

check the calibration value

 and possibly 

regulating the adjustment bush (see §6) that is separate from the 
electrical compartment. 

13 -  STOPPING AND DISMOUNTING 

Before  starting  the  following  operations,

  ensure

  that  plant  and 

equipment  have  been  put  in 

conditions

  allowing  to  carry  out 

them safely

 

Remove the power supply (signal) from the electrical line. 

With reference to Fig 5,11 and 12. 

Loosen and remove the seal press being careful not to bend the 
capillary and protective sheath (Fig.4). 
Warning: Do not touch the bulb and the parts in contact with the 
thermowell if hot. 
Loosen and remove the fitting (3) then extract the bulb (5) from 
the  thermowell  (4)  holding  it  by  the  capillary  tube  (1),  without 
bending it. 

 WARNING:

 

Instrument series TXA, flameproof.

  

Before  open  the  cover  or  the  cable  gland  of  the  junction  box 
check the absence of explosive atmosphere and check that the 
instrument is 

de energized

Unscrew the swivel (3) (electric cable tubing).  
Remove  cover  from  junction  box  and  disconnect  wires  from 
terminals and grounding screws. 
Remove  the  screws  fixing  the  box  to  the  panel  (or  pipe)  and 
remove the instrument taking care to slide electric conductors out 
from the case 
Mount the cover of the junction box. Insulate and protect cables 
around, if any. Temporarily plug the thermowell 
In  case  of  flameproof  or  intrinsic  safety  instruments,  it  is 
recommended to follow, at least, the standard IEC/EN-60079-17 
for the withdrawal from service of electrical apparatus. 

14 -  DISPOSAL 

The  instruments  are  mainly  made  of  stainless  steel  and 
aluminium  and  therefore,  once  the  electrical  parts  have  been 
dismounted and the parts coming into contact with fluids which 
could be harmful to people or to environment have been properly 
dealt with, they can be scrapped. 
 

 

Summary of Contents for TXS Series

Page 1: ...eights are not binding unless released on certified drawings CAUTION Before installing using or carrying out maintenance on the instrument it is necessary to read and understand the indications given...

Page 2: ...vates one or two simultaneous release electric microswitches The microswitches are of the rapid release type with automatic rearm When the temperature moves away from the set values returning towards...

Page 3: ...strument closes the circuit when the set point is reached with temperature on fall closure on fall The temperature switch must be kept in the normal installation position i e with the temperature conn...

Page 4: ...ion and accidental bumps Fig 6 Temperature switch for ambient temperature measurement 9 5 ELECTRICAL CONNECTIONS It is recommended to carry out the electrical connections according to the applicable s...

Page 5: ...external condition of the enclosure In case of flameproof or intrinsic safety instruments inspections of the electrical installation are to be carried out also according to customer procedures and at...

Page 6: ...ened electrical joints Interrupted or short circuited electrical line Microswitch contacts damaged Filling fluid leakage Check all electrical joints Check the conditions of the electrical line Replace...

Page 7: ...allation Annex 1 Model code 1 MODEL CODE TX For further information see datasheet 1 1 Ignition protection mode S Weatherproof A Ex d 1 2 Enclosure code material 2 Aluminium 4 316 s s B Direct Mounting...

Reviews: