All information, illustrations and technical specifications in this publication correspond to the latest version as per the
time of publishing. Constructions and designs are subject to modifications without prior notice.
19
3.0. Disconnecting
3.3.
DISMANTLING WITH STANDARD THREE-POINT LINKAGE CAT.1
•
Unrig the PTO-Shaft.
•
Lower sweeping machine.
•
Release tension in upper
link and release from
sweeping machine.
•
Release lower connecting
rod turnbuckles and pull
out the bolt for the
lower connecting rod.
•
Lay down the unrigged
PTO-Shaft for storing
as illustrated in
picture 2350.26
3.4. DEMOUNTING WITH COUPLING TRIANGLE
•
Unrig the PTO-Shaft.
•
Pull off the spring ring
pin and pull out the
locking pin up to the
second bore.
•
Lock position using the
spring pin.
•
Lower sweeping machine.
•
Lay down the unrigged
PTO-Shaft for storing
as illustrated in
picture 2350.28