Operating
and
indicating
elements
Chapter 4
06/06/19
Working Instructions WIDOS HRG 6, Segment
Page 17 of 47
4.3
Planer
No. Name
Function
15
Safety bolt
- Is axially secured by means of a grub screw. For
removing the safety bolt, turn it until the lever shows
almost vertically upwards, then remove it.
16
Movable supporting fork
- For inserting / lifting-off the planer. After removing the
safety bolt, the supporting fork moves into direction of
the arrow.
17
Supporting bolt
- Insert the planer with the supporting bolts in the
locking forks of the clamping rings / reception box.
18
Connnecting cable with plug
CEE-16A
- Connect with socket 400 V / 16 A on hydraulic aggregat
19
Screw for chain tightening
- Release the screw and move it in the slot for
tightening or releasing the planer chain. Tighten again
firmly the screw.
20
Switch on/off
- The on/off switch of the planer is situated at the planer
plug.
21 Vent
screw
-
Attention! Never put the planer on its side, there is
the risk of oil slick at the vent screw.
Remove the safety bolt only during inserting the planer into the basic machine or
taking out of the basic machine!
16
15
17
18
20
21
19
Summary of Contents for HRG 6 Segment
Page 29: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 31 of 47...
Page 30: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 32 of 47...
Page 31: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 33 of 47...
Page 32: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 34 of 47...
Page 33: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 35 of 47...
Page 34: ...Wiring diagrams Chapter 8 06 06 19 Working Instructions WIDOS HRG 6 Segment Page 36 of 47...