![widos 4000 WM Working Instructions Translation Download Page 69](http://html1.mh-extra.com/html/widos/4000-wm/4000-wm_working-instructions-translation_979300069.webp)
Kunststoffschweißtechnik
Welding T-piece with 90° and 45°
Chapter 7
20.08.2014 Working
instructions
WIDOS 4000 WM
Page 50 of 68
First welding (for smaller diameters):
The prepared pipes are welded in both clamping tools in the front.
For a T-90° welding mount the clamping tool on both tables, drill holes no.: „
5/2
“, (drill holes
are marked).
Top view of T-45° lower clamping tools for
first welding with smaller diameters (drill
holes marked).
View with clamping tools for T-45° first
welding with smaller diameters.
T-45°-clamping tool
T-45°-clamping tool