MOUNTING STATION FOUNDATION DETAIL
POST AND RAMP - INSTALLATION PROCEDURE
1. Excavate the main holes for the cable runway posts as illustrated on page 3.
2. Erect the post assemblies in the excavated holes on a solid base and use a temporary supports to maintain the
correct position.
3. Check the dimensions and place the concrete around the posts, the top of the concrete should slope away from
the posts slightly.
4. Excavate the holes for the ramp frame, also illustrated above and on page 3.
5. Position the ramp frame into the holes and adjust so that the top of the ramp is 500mm above the finished
surface level.
6. Check the dimensions and place concrete around the posts, the top surface of the concrete should slope
away from the posts slightly.
7. Leave the concrete for a minimum of 24 hours before continuing with the installation of the wire.