ASSEMBLY OF POSTS AND STEEL CAPS
3
Insert the 5.2m (Landing Station) & 5.6m (Take Off Station) posts from the
timber set into the Strut Post Caps (item 3). Secure to post using a M12 X
170 Hex Head as illustrated. Then drill a 6mm pilot hole through lower hole
and insert the M10 x 80 Coach
Screw with washer & Donut.
Refer to page 3 for post length locations
NOTE: If using steel posts replace the Coach Screw with M10 x 40 Hex
Head Bolts and locate in the pre threaded holes.
ASSEMBLY OF POSTS AND CROSSRAILS
Insert the 4.7m (Landing Station) & 4.95m (Take Off Station)
posts from the timber set into the Crossrails (item 2 & 4). Drill
a 6mm pilot hole through the two side holes
and insert the M10 x 80 Coach Screw with washer & Donut.
Then, use a M12 X 170 Hex Head through the lower hole.
Refer to page 3 for post length locations
NOTE: If using steel posts replace the Coach Screw with
M10 x 40 Hex Head Bolts and locate in the pre threaded
holes.
10
14
18
ASSEMBLY OF RAILS TO STRUT POST CAPS
Take one of the posts with the Strut Post Cap already in place and
attach to the Crossrail wing. The post cap should be fixed to the
outside of the Crossrail wing as illustrated above. Connect using
the supplied M16 x 50 Hex Head Bolt, Washer & M16 Nyloc Nut.
Repeat this procedure for all four posts so that you are left with
two assemblies.
NOTE: The M16 x 50 Hex Head Bolts should be tight but still allow
the legs to pivot. The final tightening can be completed once installed.