background image

Page   of 

3

7

SETTING OUT POINTS & FOUNDATION DETAIL

MOUNTING STATION

LANDING STATION

All foundations 750mm x 750mm x 1050mm deep unless otherwise specified

NOTE: If required the support legs for the end station may be shortened but the minimum depth in the
ground must be no less than 1050mm (Ensure all shortened posts are treated or primed)

POS

T B

(560

0mm

)

POST

 B

(5600

mm)

PO

ST

 D

(52

00m

m)

POS

T D

(520

0mm

)

POST C

(4700mm)

POST A

(4950mm)

POST A

(4950mm)

POST C

(4700mm)

33000

1663.5

1275

18°

23°

3423

1160

1500

2580

2365

1

0

6

0

1

0

6

0

3

0

9

0

8

6

0

2

7

6

0

RAMP FOUNDATIONS 
300 X 300 X 400 DEEP

UPRIGHT FOUNDATION 
1800 X 750 X 1050 DEEP

UPRIGHT FOUNDATION 
1800 X 750 X 1050 DEEP

Summary of Contents for TRADITIONAL 30M CABLE RUNWAY

Page 1: ...READ INSTALLATION INSTRUCTIONS THOROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND TIGHTEN ALL FIXINGS...

Page 2: ...OF 2 4 START STATION FOUNDATIONS 300 X 300 X 300 DEEP FOUNDATIONS 750 X 850 X 800 DEEP FOUNDATIONS 1800 X 750 X 800 DEEP END STATION 25115 4 2365 1 2581 8 1498 1160 3423 2758 8 860 3089 6 30062 3 18 0...

Page 3: ...AGE OF 3 4 SURFACING LAYOUT MIN SPACE 2000 1000 1000 4000 24908 7 4000 1000 2000 1000 4000 24908 7 4000 32908 7 4000 WETPOUR AREA 106 SQ METRES 40mm WETPOUR SURFACING 61 6 LINEAR METRES WETPOUR EDGING...

Page 4: ...PAGE OF 4 4 22 GRASS SAVER TILES 1 5M X 1 0M...

Page 5: ...M10 PLAIN WASHER M10SWASH 8 13 32MM 12G WASHER M12WASH LARGE 16 14 M16 32MM PLAIN WASHER M16SWASH 8 15 M12 NYLOC NUT M12NYLOC 8 16 M16 NYLOC NUT M16NYLOC 4 17 M10 DONUT YELLOW M10DONUT 24 18 TENSIONIN...

Page 6: ...o side holes and insert the M10 x 80 Coach Screw with washer Donut Then use a M12 X 170 Hex Head through the lower hole Refer to page 3 for post length locations NOTE If using steel posts replace the...

Page 7: ...d but the minimum depth in the ground must be no less than 1050mm Ensure all shortened posts are treated or primed POST B 5600mm POST B 5600mm POST D 5200mm POST D 5200mm POST C 4700mm POST A 4950mm P...

Page 8: ...posts the top of the concrete should slope away from the posts slightly 4 Excavate the holes for the ramp frame also illustrated above and on page 3 5 Position the ramp frame into the holes and adjus...

Page 9: ...r level ground conditions The landing station should be installed 750mm lower into the ground than the mounting station The surfacing to the crossbeam centre should be 3750mm at the mounting station a...

Page 10: ...y to crease the take up drum when subjected to pressure Ensure the cable is wound neatly around the ratchet drum 14 Attach the Button Seat with the attached chain to the Cable Runner Check the distanc...

Page 11: ...tside one on the inside of tyre wall nearest main support stations Note Cable grips are not to be fitted to tyre wall where cable runner impacts Ensure that the stop dimensions illustrated on page 6 a...

Reviews: