POST ASSEMBLY & INSTALLATION
Excavate the foundations as detailed using sheet PICUS12-SPEC. Posts labelled 003,004,005 &006 on this part of the unit should all be leaning at a 10
~
angle away from posts 001 & 002. All posts should all be pre-drilled and of the correct location to achieve this angle. Ensure all bolts and screws are
loosely fitted to give enough movement for ropes and timbers to have the appropriate tensioning.
To use as a starting point, prop and concete posts 001 & 002 into the corresponding foundation holes ensuring the posts are rotated correctly to aid with
later stages of this installation. Prop posts 003 & 006 into the foundation holes. As illustrated below add the horizontal post 011 through the uprights and
secure to posts 003 & 006 using the supplied Coach Bolts. With the two posts secured use another Coach Bolt to secure post 011 to center post 001.
(posts 001 & 002 do not have a pre-drilled hole to secure post 011 & 012 so this will need to be pre-drilled prior to securing with a Coach Bolt)
Repeat this step for 002, 004, 005 & 012.
003
004
005
006
011
012
Note: Use the dimesions below to ensure the correct height is being obtained and the correct pre-drilled holes are being utilised