PAGE OF
8
16
007
018
006
013
With posts 013 and 018 secured in place, position and secure posts 017 & 019 using the dimensions below. These require fixing with 1 x Coach Bolt and
1 x Coach Screw in each post.
017
019
355
.0
157
5.0
1
2
4
0
.0
9
0
1
.0
011
Both posts 011 & 018 have not been pre-drilled to accept a Coach Bolt so will require drilling on site. Line up post 017 to the underside of post 018 using
the below dimensions and drill a hole through. Secure with the supplied Coach Bolt. Next, line up post 017 on top of post 011, mark the hole position, drill
an 8mm pilot hole and secure using the supplied Coach Screw. Repeat this same procedure with post 019 being secured to the underside of post 011 with
a Coach Bolt and on top of post 018 with a Coach Screw.
007
013
018
019
017
011
4
7
8
9
3
7
9