Position post labelled 034 against the inside of 033 with the other end resting on 018. Line up the hole on 034 with the pre-drilled hole on the upright post
and secure to the upright post using the supplied Coach Bolt. Secure the opposite end to post 018 using the supplied Coach Bolt. NOTE: Before fully
tightening the fixings, offer the ropes leading from 034 to the opposite beam labelled 024 to ensure the rope is appropriately tensioned.
8
5
0
.0
7
3
5
.0
4
7
8
9
024
As illustrated, position post labelled 035 agianst upright post 033 lining up the counterbore hole with the drill hole. Rest the other end on horizontal beam
024. Secure the two items 033 & 035 together using the supplied Coach Bolt. Position the opposite end thats resting on item 024 so that the counterbore
hole is approx 2160mm from the end. Mark the position of the hole and remove timber 035. Drill a
n
8mm pilot hole, re-position and secure post 035 to
post 024 using the supplied Coach Screw.