![Wickes AQUATRONIC POWER Product Manual Download Page 18](http://html1.mh-extra.com/html/wickes/aquatronic-power/aquatronic-power_product-manual_978792018.webp)
18
4
7
6
5
3
2
1
4
7
6
5
3
2
1
3.
Switch on the electrical supply.
COMMISSIONING
Outer Flow
Control
The unit
must not
be run dry. Before proceeding any further with the
installation the shower unit must be commissioned.
General Commissioning
1.
Connect the flexible hose to the
outlet of the shower unit.
Caution!
Do not over-tighten.
2.
Turn on the water supplies and
check for leaks.
4.
Turn the outer flow control
anticlockwise
to full flow.
5.
Rotate the inner temperature
control anticlockwise to check the
hot supply and clockwise to check
the cold supply.
7.
The shower unit is now
commissioned.
Inner
Temperature
Control
Temperature
Indicator
6.
Turn the flow control
clockwise
to
the
off
position.
Hose Washer
Hose
Cooler
Warmer
Maximum
Flow Position
4
7
6
5
3
2
1
Outer Flow
Control
Off
Position