Page 36
15628-0-0903
Installing Optional CIB-2 Blower
1. Loosen, but do not remove, (4) hex-head screws located on
the exterior, bottom of the appliance.
2. Position the blower assembly at the rear of the appliance.
The blower assembly has (4) keyholes for attachment to the
exterior, bottom of the appliance.
3. Place the large diameter holes in the keyholes over and
behind the (4) hex-head screws that were loosened in Step
1. Push inward on the blower assembly to lock the keyholes
into position behind the screws. Tighten (4) hex-head
screws to secure blower assembly to exterior, bottom of the
appliance.
4. Remove wire channel from channel divider by removing (2)
10 x 1/2" screws. Note: If optional blower is being installed
during initial installation of appliance, the wire channel will
not be attached to rear cover. (Refer to Wire Channel
Installation, Page 13)
5. Remove channel divider from rear cover by removing (2)
10 x 1/2" screws.
6. Attach fan control to OFFSET, fan control bracket (Part 9B,
Page 37) with (2) 6 x 1/4" screws provided in hardware
package.
7. Attach fan control with bracket onto air drop with (2) 10 x
1/2" screws provided in hardware package.
8. Route fan control wires through 1/2" extruded hole on
channel divider. Attach fan control wires to fan control.
9. Attach channel divider with (2) 10 x 1/2" screws from Step
5.
10. Route wires from fan control and ON/OFF/REMOTE switch
within wire channel.
11. Attach wire channel to channel divider with (2) 10 x 1/2"
screws from Step 4. (Refer to Wire Channel Installation,
Page 13)
12. Insert AUTO/OFF/ON switch into rectangular notch on
valve bracket. Be sure to insert AUTO/OFF/ON switch
with letters (words) upright. (See wiring diagram)
13. Attach 1/4" push-on terminal from blue wire on the fan
control to the AUTO (top) tab on the switch.
14. Attach 1/4" push-on terminal from black wire to the OFF
(middle) tab on the switch.
15. Attach 1/4" push-on terminal from white wire on the fan
control to the ON (bottom) tab on the switch.
16. Installation of optional CIB-2 blower is completed.
Fan Control
The fan control is a non-adjustable automatic type The fan
control will require between 5 and 10 minutes of main burner
operation before the fan control "closes" and activates the
blower. The blower will continue to run between 5 and 10
minutes after the main burner shuts off, before the fan control
"opens" and deactivates the blower.
OPTIONAL BLOWER INSTALLATION INSTRUCTIONS