33740-11-0816
Page 29
FRAMING AND FINISHING (continued)
Vertical Firestops
Vertical runs of this system which pass through ceilings require
21(FHLOLQJ¿UHVWRSDWWKHKROHLQHDFKFHLOLQJWKURXJKZKLFKWKH
vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check
WKH ÀRRU DERYH IRU DQ\ REVWUXFWLRQV VXFK DV ZLULQJ RU SOXPELQJ
runs. Reposition the appliance and vent system, if necessary, to
DFFRPPRGDWHFHLOLQJMRLVWVDQGRUREVWUXFWLRQV
&XWDLQFK[LQFKKROHWKURXJKWKHFHLOLQJXVLQJWKH
center point previously marked. Frame the hole with framing lumber
the same size as the ceiling joists.
See Figure 47.
If the area
above the ceiling is NOT an attic, position and secure the ceiling
¿UHVWRSRQWKHFHLOLQJVLGHRIWKHSUHYLRXVO\FXWDQGIUDPHGKROH
See Figure 48.
If the area above the ceiling is an attic, position
DQGVHFXUHWKH¿UHVWRSRQWRSRIWKHSUHYLRXVO\IUDPHGKROH
See
Figure 49.
NOTE:
Remove insulation from the framed area in the attic before
LQVWDOOLQJWKH¿UHVWRSDQGRUYHQWSLSHV
Figure 47
Figure 48
Figure 49
Finishing
Finish the walls with the material of your choice.
Figure 1 and 2
on
page 8 shows the minimum vertical and corresponding maximum
horizontal dimensions of mantels or other combustible projections
DERYHWKHWRSIURQWHGJHRIWKH¿UHSODFH
Only non-combustible materials may be used to cover the black
¿UHSODFHIURQW
WARNING
:KHQ ¿QLVKLQJ WKH ¿UHSODFH QHYHU REVWUXFW RU PRGLI\ WKH JDS
around the glass frame in any manner. Provide adequate
clearances around air openings into the combustion chamber.
CAUTION
,IWKHMRLQWVEHWZHHQWKH¿QLVKHGZDOODQGWKH¿UHSODFHVXUURXQG
WRSDQGVLGHVDUHVHDOHGD)PLQLPXPVHDODQWPDWHULDO
must be used. These joints are not required to be sealed. Only
QRQFRPEXVWLEOH PDWHULDO XVLQJ ) PLQLPXP DGKHVLYH LI
QHHGHGFDQEHDSSOLHGDVIDFLQJWRWKH¿UHSODFHVXUURXQG