page 3 – 12
E-Series Network / Apr 2007
X P O I N T S O F T W A R E S E T U P G U I D E
VDip Settings
To view or modify the Virtual Dip Switch Settings select the Configure / VDip
Settings menu option, which will display the forms shown below. The content of the
forms will vary depending on the surface type. The Defaults tab (shown on the left
below) shows the default values for all signals unless specifically overridden. To
override settings for a signal press the “Per Signal” tab, dial up the desired Input Signal
ID, check the “Override Defaults” box, make your selections, and click the “OK”
button to save your changes.
• PFL/Cue Dropout - When a channel’s CUE button is pressed it will assign the
channel’s signal to the CUE bus. When “PFL/Cue Dropout” is checked it causes the
channel’s CUE function to be de-activated whenever the channel ON switch is
pressed.
• EFS - Will turn the channel OFF when the fader is moved all the way down and turn
the channel ON when the fader moves from the fully down position.
• Fader Cue - Will assign the signal to the Cue bus when the fader is moved all the way
down.
• UTL Pre Fader - When checked will cause the signal assigned to the UTL output to
be tapped before the fader. On the E-6 surface there is no UTL output - instead the
function applies to the PGM D output.
• UTL Pre On - When checked will cause the signal assigned to the UTL output to be
tapped before the channel ON/OFF switches. On the E-6 surface there is no UTL
output - instead the function applies to the PGM D output.
• Timer Restart - The digital timer can be programmed to automatically reset to zero
and begin counting up when the channel’s ON button is pressed. To enable this
function the “AUTO” button in the timer section has to be activated.
Summary of Contents for E-SAT
Page 34: ...page 1 26 E Series Digital Audio Network System Flow Diagram E Series Network Jan 2008 ...
Page 111: ...page 4 21 SAT E Mother Board MBNC 1 Load Sheet E Series Network Apr 2007 ...
Page 112: ...page 4 22 S 16 Wheatnet E Super Hub Main Card IB 1 Load Sheet E Series Network Apr 2007 ...
Page 114: ...page 4 24 S 8 Wheatnet E Super Hub Main Card IBA 1 Load Sheet E Series Network Jan 2008 ...
Page 115: ...page 4 25 Micro Satellite Main Card MCS 8 MCS 8E Load Sheet E Series Network Jan 2008 ...