G E N E R A L I N F O R M A T I O N
page 1 – 13
E-Series Network / Apr 2007
CAT5 Wiring Tip
S-8 E-WHEATNET - E-Series Audio Routing Switch
S-8 E-WHEATNET is the high speed central network switch that
connects up to eight studios from the technical operations center. E-
WHEATNET is capable of simultaneously switching 64 bi-directional
audio channels to 8 ports —that’s 1024 traffic channels.
This unit occupies one 19” wide rack unit (height 1 3/4”), and is 13”
deep.
Front panel LED indicators display system status, sample rate, and
external clock functions. No external PC is required for continuous opera-
tion.
The eight rear mounted RJ-45 audio network ports easily integrate
multiple studio systems. Installation is simple: run one UTP CAT5 cross-
over cable to the S-8 E-WHEATNET from each of your studios or locally
mounted I/O centers.
Another wiring option is to run a UTP CAT5 straight connection from
the rack room to a small RJ-45 patch point block in each studio. The final
connection to each E-SAT rack or control surface can then be made using
an off the shelf crossover patch cable.
Power up Sequence — When first powering the system it is best to apply
Power up Sequence — When first powering the system it is best to apply
Power up Sequence — When first powering the system it is best to apply
Power up Sequence — When first powering the system it is best to apply
Power up Sequence — When first powering the system it is best to apply
power to the S-8 E-WHEATNET first, then E-SAT racks, and finally the
power to the S-8 E-WHEATNET first, then E-SAT racks, and finally the
power to the S-8 E-WHEATNET first, then E-SAT racks, and finally the
power to the S-8 E-WHEATNET first, then E-SAT racks, and finally the
power to the S-8 E-WHEATNET first, then E-SAT racks, and finally the
surface. You may cycle power on surfaces or E-SAT as required after the
surface. You may cycle power on surfaces or E-SAT as required after the
surface. You may cycle power on surfaces or E-SAT as required after the
surface. You may cycle power on surfaces or E-SAT as required after the
surface. You may cycle power on surfaces or E-SAT as required after the
S-8 E-WHEATNET is up and running.
S-8 E-WHEATNET is up and running.
S-8 E-WHEATNET is up and running.
S-8 E-WHEATNET is up and running.
S-8 E-WHEATNET is up and running.
E-Series Network / Jan 2008
!
Summary of Contents for E-SAT
Page 34: ...page 1 26 E Series Digital Audio Network System Flow Diagram E Series Network Jan 2008 ...
Page 111: ...page 4 21 SAT E Mother Board MBNC 1 Load Sheet E Series Network Apr 2007 ...
Page 112: ...page 4 22 S 16 Wheatnet E Super Hub Main Card IB 1 Load Sheet E Series Network Apr 2007 ...
Page 114: ...page 4 24 S 8 Wheatnet E Super Hub Main Card IBA 1 Load Sheet E Series Network Jan 2008 ...
Page 115: ...page 4 25 Micro Satellite Main Card MCS 8 MCS 8E Load Sheet E Series Network Jan 2008 ...