WD-100GR
Rev. 5.0 (202207)
Installation instructions
10
3.2
Requirements for the installation site
3.2.1
Lighting
In order to ensure the best possible working conditions during installation, opera-
tion, servicing and maintenance, make sure that the machine is installed in a well-
lit room.
3.2.2
Ventilation and ambient temperature
The machine is intended to be used in an indoor environment at normal room tem-
perature. The machine produces heat and steam when in operation. In order to
ensure the best possible working conditions, a certain air renewal rate is required
in the dishwashing room. The ventilation requirements for the dishwashing room
are to be dimensioned on the basis of the applicable standards.
3.2.3
Power supply
Power supply connections are made by qualified personnel in a way that complies
with local and national regulations. The machine’s capacity requirements are stip-
ulated in TECHNICAL SPECIFICATIONS.
3.2.4
Water
Water connections are made by qualified personnel in a way that complies with
local and national regulations. The machine’s capacity requirements are stipulat-
ed in TECHNICAL SPECIFICATIONS.
3.2.5
Drain/waste pipe
There must be a waste pipe with an effective trap for the machine’s waste water
and for water used for rinse cleaning. The machine’s capacity requirements for
drainage are stipulated in TECHNICAL SPECIFICATIONS.
3.2.6
Space for servicing
A 1-metre area should be left clear in front of the machine for servicing purposes.
Depending on if the machine has different accessories, there may also be such a
requirement at the infeed and outfeed ends as well as above the machine.