FPAC2 UPgrAde
InstallatIon and operatIon manual
4 deCOMMIssIONINg The Old deVICe ANd
COMMIssIONINg The New ONe
step 8:
Once the new device appears in the
Decommissioned Fieldbus Devices list check if
it is available for commissioning. If not, right-
click on it and select Place in Standby. Wait until
this process is finished and the window closes.
See Figure 8.
step 9:
Right-click on the old device’ and
select Decommission. In the window that
opens, choose the option Make Spare. On the
next window, click on Do Not Wait to close it.
See Figure 9.
FIguRE 8
FIguRE 9