FPAC2 UPgrAde
InstallatIon and operatIon manual
7 dOwNlOAdINg ANd TesTINg The New
CONFIgUrATION
step 25:
On the Control Studio menu, click
Download. A message will appear, DO NOT
click upload Them Now, just click on Download
Now. See Figure 22.
step 26:
If a message appears, click Yes/
OK and wait until the download is finished
successfully. See Figure 23.
FIguRE 22
FIguRE 24
FIguRE 23
step 27:
Close the download window and
open the Control Studio in online mode (or
the operator window). Command the valve to
move to the opened and closed positions and
check whether the new device is reporting
the valve position correctly. If necessary make
adjustments to the cams or limit switches.
See below screenshot after the replacement
showing the valve closed and opened.
See Figure 24.