35
i
nStallation
S
et
-u
P
Figure 64b: Log 5 in Place
Figure 65: Log 6 in Place
3. Install Log 9. Insert the hole on the left side into the pin tab at the back of the grate. The right side
self locates on log 7. Leave a 1/8” gap between the rear brick panel and the log.
Figure 63b: Log 9 in Place
Figure 63a: Log 9 Right Side in Place
4. Install Log 5. Place the log on top of the grate with the log locators on the left side of the grate inserted
into the grooves on log 5.
5. Install Log 6. Place the log on top of the grate with the log locators on the right side of the grate
inserted into the grooves on log 6.
Figure 64a: Log Locators and grooves
Figure 65a: Position Log 6