background image

 

 

12 

Operation 

4.  Now  open  the  upper  beam  (3)  and  the  lower  beam  (1)  by 

unscrewing  both  tommy  screws  (2).  Both  springs  (5)  will  lift  the 
upper beam (3). 

5.  Now position the sheet metal inside the edge-folding unit.  

6.  Fasten the tommy screws (2) to keep your sheet-metal in place. 

Now pull the levers of the movable folding bar with smooth and 
continuous pressure to order to fold the sheet metal. 

Hints on Operation 

  If  folding  a  closed  square  tub,  one  tommy  screw  (2)  has  to  be 

removed first  in order to withdraw the tub from the edge-folding 
unit.  To  remove  the  square  tub  from  the  edge-folding  unit  after 
removing the tommy screw, lift up the upper beam and take out 
the square tub from the unit. 

  With  the  edge-folding  unit  repeat  folding  procedures  can  be 

done with different distances without the need to remove and re-
insert the sheet material into the unit again. 

  Sheet  material  of  different  thickness  can  be  folded  by  screwing 

or loosening the adjusting screws (4). 

  Please  note  the  max.  material  thickness.  Do  not  exceed  the 

max.  capacity  of  the  edge-folding  unit  as  this  will  damage  the 
middle part of the edge-folding unit. 

Maintenance and Care 

  The edge-folding unit is maintenance-free. 

  Keep  the  edge-folding  unit  clean.  Lubricate  the  moving  parts 

from  time  to  time  with  a  few  drops  of  machine  oil.  Regularly 
check the firm fit of all parts. 

  When not in use, store the edge-folding unit in a dry place. 

Summary of Contents for 84 95 90

Page 1: ...Abkanteinrichtung bis 630 mm Arbeitsbreiten Artikel Nr 84 95 90 Edge Folding Unit up to 630 mm Working Width Article No 84 95 90 Bedienungsanleitung Instruction Manual...

Page 2: ...ake it easier for you to handle the device and help prevent misunderstandings and possible damage or injury Bitte machen Sie sich in der Reihenfolge der Kapitel mit dem Ger t vertraut und bewahren Sie...

Page 3: ...3 bersicht Overview 2 2 5 4 5 6 8 7 7 3 1...

Page 4: ...4 1 Unterwange Lower Beam 2 Knebelschraube Tommy Screw 3 Oberwange Upper Beam 4 Stellschraube Adjusting Screw 5 Feder Spring 6 Lasche Plate 7 Hebel Lever 8 Biegewange Folding Bar bersicht Overview...

Page 5: ...ungsgefahr Halten Sie den Arbeitsbereich sauber und aufger umt Un ordnung kann Unf lle zur Folge haben ACHTUNG Bleche k nnen sehr scharfkantig sein Seien Sie beim Umgang mit Blechen sehr vorsichtig Be...

Page 6: ...a clean and tidy Disorder can lead to accidents CAUTION Sheet material can be very sharp Be very careful when handling sheet material Note that sheet material has sharp edges and burrs Wear cut resist...

Page 7: ...travail propre et bien rang Le d sordre peut conduire des accidents ATTENTION Les plaques peuvent tre tr s tranchants Soyez tr s prudent lors de la manipulation des plaques On notera que les plaques...

Page 8: ...lavoro pulita e ordinata Il disordine pu portare a incidenti ATTENZIONE Le lastre possono essere molto taglienti Fare molta attenzione quando si maneggiano lastre Notare che le lastre hanno bordi tag...

Page 9: ...Folgekantungen U Profile und geschlossene Vierkantrohre ab einer Mindestseitenl nge von 50 mm hergestellt werden Montage 1 Spannen Sie die Abkanteinrichtung an der angeschwei ten Lasche 6 fest in eine...

Page 10: ...s Vierkantrohres nach dem Entfernen der Knebelschraube heben Sie die Oberwange an und schieben Sie das Vierkantrohr seitlich heraus Mehrmaliges Abkanten mit verschiedenen Abst nden ist ebenfalls m gli...

Page 11: ...uel folding U profiles and closed square tubs with a minimum width of 50 mm are also possible Mounting 1 The edge folding unit has to be mounted firmly into a vice by means of the plate 6 at the botto...

Page 12: ...ving the tommy screw lift up the upper beam and take out the square tub from the unit With the edge folding unit repeat folding procedures can be done with different distances without the need to remo...

Page 13: ...Technische Daten Technical Data 13 47 5 mm 49 5 mm 21 5 mm 1 2 mm 21 5 mm 47 5 mm...

Page 14: ...n k nnen Entsorgen Sie ihn daher nicht in die M lltonne sondern f hren Sie ihn bitte Ihrer Sammelstelle f r Wertstoffe zu Dear Customer Please help avoid waste materials If you at some point intend to...

Page 15: ...Notizen Notes 15...

Page 16: ...1 32 Telefon 07723 4 27 59 54 Telefax 0180 5 30 31 30 Telefax 07723 4 27 59 23 Internet www westfalia de Internet www westfalia versand at Schweiz UK Westfalia Westfalia Utzenstorfstra e 39 Freepost R...

Reviews: