Installation Guide
5. Installation
5.2 Ultrastar Data60 Installation Procedure
Step 14 :
Make sure the CMA(s) is in operational position by folding the arm(s) in toward the enclosure and
attaching the elbow end(s) to the connector(s) attached to the rail. Verify that all of the cabling is
in functional order and does not bind or catch.
Step 15 :
Test for binding in the extension of the arm by gently pulling the enclosure out of the rack,
ensuring the cables extend properly and that the system doesn’t bind at all. If it does, examine
the point at which the binding occurred and adjust the seating of cables in the baskets, check
the connections to the rails, and examine the joints of the arm to ensure that they are all
functioning properly.
Step 16 :
Secure the chassis top cover to the rack using the captive M5 thumb-screws as shown in the
following image. Use a T15 Torx screwdriver, and tighten the screws to 3.38-3.61 Nm / 30-32 in-
lbf.
Figure 34:
Cover Retention Screws
Step 17 :
Now that the chassis is installed, test the installation by sliding the enclosure in and out of the
rack a minimum of three times. If the enclosure binds, catches, or displays any incorrect motion
or behavior repeat the installation.
Note:
Adjustments of the vertical rack rails may be required to fix any issues that
may occur.
Step 18 :
Grasp both handles at the front of the enclosure and pull with even pressure to extend the
chassis out of the rack until it is stopped by the safety latches. The safety latches will prevent the
enclosure from coming out of the rack completely and the cover will remain in the rack attached
to the rear alignment brackets.
56