40
926.275.1 - GB
INSTRUCTIONS FOR FITTERS
… SEPARATE FlUE AND AIR DUCTS
This type of installation makes it possible to discharge exhaust fumes both outside the building and into single flue ducts.
Comburent air can be drawn in at a different location from that of the flue terminal. The splitting kit comprises a flue duct
adaptor (100/80) and an air duct adaptor. For the air duct adaptor, fit the screws and seals previously removed from the
cap.
Adjusting the air regulator for sepa-
rate flues
This regulator must be adjusted to
optimise combustion efficiency and
parameters. After turning the air intake
connecter, which can be mounted both
to the right and the left of the exhaust
flue duct, suitably adjust the excess
air according to the total length of the
combustion exhaust and inlet flue ducts.
Turn this regulator counter-clockwise
to decrease the excess of comburent
air and vice-versa to increase it. To fine
tune, use a combustion product analyser
to measure the amount of CO2 in the
fumes at maximum heat capacity, and,
if a lower value is measured, gradually
adjust the air regulator until the amount
of CO2 indicated in the following table is
measured. To mount this device correct-
ly, consult the relative instructions.
The 90° bend allows the boiler to be connected to a flue-air duct in any direction as it can be rotated by 360°. It can also
be used as a supplementary bend combined with a duct or a 45° bend.
• A 90° bend reduces total duct length by 0.5 metres.
• A 45° bend reduces total duct length by 0.25 metres.
wARNING
The boiler inlet and outlet ducts (C52) must comply with the following maximum lengths:
- inlet duct: lmax= 8m
- outlet duct: lmax= 15m
The first 90° bend is not included when calculating the maximum available length.
Figure 8
Flue duct adaptor
Connector
Air intake restrictor
Boiler
model
(l1+l2)
Position
of air regulator
Flue
RESTRICTOR
A
CO
2
%
G20
G31
24 F
0 ÷ 4
A
NO
6,4
7,1
4 ÷ 14
B
14 ÷ 23
C
CG_2114 / 0902_2801
Summary of Contents for quasar D
Page 29: ......
Page 55: ......
Page 81: ......
Page 107: ......
Page 110: ...110 926 275 1 RU WE STEN 2 3 1 0805_2302 CG_2072...
Page 111: ...111 926 275 1 RU 4 5 1 3 1 1 1...
Page 112: ...112 926 275 1 RU 5 OFF 9 7 8 0 7 1 5 2 6 2 24 F 24 CG_2115 0902_0603 A B...
Page 120: ...120 926 275 1 RU 9 0712_1208 CG_2008 17 230 3 3x0 75 2 8 9 2 L N L N 1 2 18 9 1 2 1 2...
Page 125: ...125 926 275 1 RU 24 F 03 10 24 03 10 2 2 3 2 0 5 3 30 5 30 25 10 24 10 3 NTC 22...
Page 126: ...126 926 275 1 RU 23 13 9912070100 2 2 19 2 2 24 1 25 0902_0606...
Page 127: ...127 926 275 1 RU 26 Kt 2 TM Te 2 0505_3002 TM Te curbe kt 27...
Page 130: ...130 926 275 1 RU 29 24 F C N R G V B V NTC NTC CG_2113 0905_2601...
Page 131: ...131 926 275 1 RU 24 C N R G V B V NTC NTC CG_2116 0905_2602...
Page 135: ......
Page 161: ......
Page 164: ...164 926 275 1 GR 1 2 3 4 2 3 RESET 1 Reset 0805_2302 CG_2072...
Page 165: ...165 926 275 1 GR 4 5 1 3 1 1 C 1 C...
Page 166: ...166 926 275 1 GR 5 OFF 9 7 8 GPL 0 7 1 5 bar 3 6 2 24 F 24 CG_2115 0902_0603 A B...
Page 180: ...180 926 275 1 GR 23 13 9912070100 2 CO2 CO 3 cm 19 C1 2 2 CO2 CO 24 1 25 l h mH 2 O 0902_0606...
Page 181: ...181 926 275 1 GR 26 faston kt 1 TM Te 2 0505_3002 TM Te kt 27...
Page 184: ...184 926 275 1 GR 29 24 F C M N R G V B V NTC NTC CG_2113 0905_2601...
Page 185: ...185 926 275 1 GR 24 C M N R G V B V NTC NTC CG_2116 0905_2602...
Page 187: ...187 926 275 1 GR...