Section VE2-848-CK6-20A
030-101704 Rev. C
R
5
1006IARC
Circuit
64-Pin
Connector
Pin #
NTWK
RCV-IN
NTWK
XMT-OUT
Wire
Color
Reference
Lead
RJ48C
Lead
RJ48C
1
33
T
5
T1
2
W-BL
1
R
4
R1
1
BL-W
2
34
T
5
T1
2
W-O
2
R
4
R1
1
O-W
3
35
T
5
T1
2
W-G
3
R
4
R1
1
G-W
4
36
T
5
T1
2
W-BR
4
R
4
R1
1
BR-W
5
37
T
5
T1
2
W-S
5
R
4
R1
1
S-W
6
38
T
5
T1
2
R-BL
6
R
4
R1
1
BL-R
7
39
T
5
T1
2
R-O
7
R
4
R1
1
O-R
8
40
T
5
T1
2
R-G
8
R
4
R1
1
G-R
9
41
T
5
T1
2
R-BR
9
R
4
R1
1
BR-R
10
42
T
5
T1
2
R-S
10
R
4
R1
1
S-R
11
43
T
5
T1
2
BK-BL
11
R
4
R1
1
BL-BK
12
44
T
5
T1
2
BK-O
12
R
4
R1
1
O-BK
13
45
T
5
T1
2
BK-G
13
R
4
R1
1
G-BK
14
46
T
5
T1
2
BK-BR
14
R
4
R1
1
BR-BK
15
47
T
5
T1
2
BK-S
15
R
4
R1
1
S-BK
16
48
T
5
T1
2
Y-BL
16
R
4
R1
1
BL-Y
17
49
T
5
T1
2
Y-O
17
R
4
R1
1
O-Y
18
50
T
5
T1
2
Y-G
18
R
4
R1
1
G-Y
19
51
T
5
T1
2
Y-BR
19
R
4
R1
1
BR-Y
20
52
T
5
T1
2
Y-S
20
R
4
R1
1
S-Y
21
53
T
5
T1
2
V-BL
21
R
4
R1
1
BL-V
22
54
T
5
T1
2
V-O
22
R
4
R1
1
O-V
23
55
T
5
T1
2
V-G
23
R
4
R1
1
G-V
24
56
T
5
T1
2
V-BR
24
R
4
R1
1
BR-V
25
57
T
5
T1
2
V-S
25
R
4
R1
1
S-V
26
58
T
5
T1
2
W-BL
26
R
4
R1
1
BL-W
27
59
T
5
T1
2
W-O
27
R
4
R1
1
O-W
28
60
T
5
T1
2
W-G
28
R
4
R1
1
G-W
Table 2. 64-Pin Amphenol Connector Wire Colors
Figure 6. Installing Amphenol and RJ48C Cables
Figure 7. Rear View, Connecting Field-provided Cables
32-pair, male
Insert plug of
Amphenol
cables (field-
provided)
field-provided
RJ48C cable
32-pair, male,
Amphenol cables
(field-provided)
3. Perform cable management on the cable per company
practice using the cable tie-downs on the panel’s rear tray.
4.
Connect cable to RCV IN connector.
the MUX (or upstream equipment) DS1 IN connector
and the VE2848-CK6’s female, 32-pair, Amphenol RCV
IN connector.
After installing the cables, when the Network equipment is ac-
tivated, signals from the Network equipment should be present
at the VE-2848C-K6 front panel, where the end-user or cus-
tomer equipment can be connected.
2.5.3
Connecting End-User or Customer RJ48C Cables
Customer connections can be made to the RJ48C jacks at the
front of the VE-2848C-K6 panel. Perform any customer equip-
ment connections per company practice. See Figure 5 if
needed.
1. Route the first RJ48C cable to the first RJ48C jack in the
VE-2848CK-6 and insert the cable’s plug into the jack.
2. Perform cable management per company practice, using
the provided cable tie-downs.
3. Repeat for each jack.
2.5.4
Connecting Other Cable Types
Up to six customer connections can be made to the
VE-2848C-K6 panel at the empty Keystone-type coupler posi-
tions. Perform customer equipment connections per company
practice.
1. Insert the preferred type of Keystone-type coupler into
the first empty Keystone position in the panel (from the
rear, see Figure 8). Remove any cover from the coupler.
2. Route a cable with a matching end plug to the first coupler,
and insert the cable’s plug into the installed coupler.
3. Perform cable management per company practice, using
the provided cable tie-downs.