GRANUDOS 45/100 PLUS V70 Touch
Index: 03
Change date: 25.04.2018
Operating instructions no.: BA SW 001-03 Granudos 45-100 PL V70T.docx
Page 33 of 92
5
Initial operation
5.1
Commissioning, comments
The work described here may only be performed by trained specialist staff or by a
specialist company. The systems installed must be inspected for appropriate
installation and tightness before commissioning.
The initial operation should be performed according to the initial operation
protocol in
Section 9.3.
The device was delivered with specific factory settings. The
setting values are provided in the operating data sheet in
Section 9.4
ATTENTION !
Alien objects that may have fallen into the rinsing device during the
installation of the piping and electrical system may cause failure of
the floater valve, injector or the suction tube of the flow switch.
Remove alien object!
Remarks
During start-up,
all fault messages are suppressed for 12 seconds
to ensure
constant flow in the rinsing tray. Filling starts thereafter when no fault is pending.
Faults during the filling process must be pending for more than 6 seconds before
the system responds and the GRANUDOS PLUS switches off.
The "Chlorine missing" switch (41) on the mixing cyclone must detect chlorine
granulated 8 seconds after the start of the 2nd dosing interval. The LED in the
"Chlorine missing" switch lights up when a sufficient amount of chlorine rotates
in the cyclone.
The current dosing cycle is completed after the message "Buffer tank full". Acid
is dosed during the next 20 seconds and thereafter, rinsing with water is
performed for 20 seconds.
The heating of the dosing pipe always remains switched on.
5.2
Initial operation, setting the operating parameters
5.2.1
Install the hose pump, roller carriers
The acid pump is installed on the right side of the standing column of the
GRANUDOS PLUS.