- 13 -
Installation manual
M-WRG-M/MB-FK1 / FK2
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L AT I O N & H E AT R E C O V E R Y
9
Installing the installation kit
9.1
Fixing the fixing plate to the wall box
►
Use the Spax screws to fix the fixing plate (see Fig. 6 and Fig. 7).
Fig. 6: M-WRG-M/MB-FK1, Fixing the fixing
plate for extract air
or
supply air
Fig. 7: M-WRG-M/MB-FK2, Fixing the fixing
plates for extract air
and
supply air
9.2
Breaking through the wall
The wall breakthrough can either be included when planning a new build or subsequently made in
the solid wall.
9.2.1
Planning the wall breakthrough for new builds
►
Commission an architect or design professional to include the wall breakthrough at a suitable
point in the construction drawing and execute it when constructing the building shell.
There are two possible versions of the wall breakthrough:
— Wall breakthrough with recess (see Fig. 8 on page 14) for installation kit
without
filler
piece M-WRG-M/Fü
— Full-width wall breakthrough (see Fig. 9 on page 14) for installation kit
with
filler
piece M-WRG-M/Fü