Chasing out channels for connecting cables
►
Chase one channel for the mains cable
(item 1 in Fig. 12) and one for the control
cable, if required (item 3 in Fig. 12).
NOTE
—
A separate channel is needed for the con-
trol cable.
—
The wall channels in Fig. 12 are shown by
way of example. Alternative cable ducts
are shown as dashed lines (items 2 and 4
in Fig. 12). For the subsequent electrical
installation work, we recommend running
the mains cable from the left and the con-
trol cable (if used) from the right at the wall
breakthrough.
9.6
Running the connecting cables
DANGER
Potentially fatal voltages.
—
The electrical installation work must only be
carried out by a qualified electrician.
—
The VDE regulations or any special safety
regulations applicable in your country apply
to the electrical installation work.
►
Disconnect the mains cable for connecting
to the ventilation unit on all poles from the
mains supply.
►
Make sure that the mains supply cannot be
switched on again.
NOTE
Table 1 and Table 2 on page 17 contain over-
views of the recommended mains cable and
control cable types. A control cable is only needed
for certain types of ventilation unit.
►
Run the mains cable (item 1 in Fig. 13) and the control cable, if required (item 2 in Fig. 13).
The cables should extend roughly 250 mm beyond the wall.
►
Fix the mains cable and the control cable (if required) in position.
Fig. 12:
Chasing out channels for connecting cables
Fig. 13:
Running the connecting cables,
dimensions in millimetres