19
4. Operating guidelines
Changing the nozzles
The hot gas nozzles are fixed to the heating element with an attachment screw.
5. Accessories
For nozzle range see page 38 - 43.
5 15 049 99
Nozzle changer
5 15 048 99
Multiple rest for six nozzles
6. Scope of supply
WHA 300 control unit with hot gas bit and safety rest
1 bag with: 3 cheese head screws hexagon socket M3X5 hexagon socket
Operating instructions
Subject to technical change without notice!
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
FAX 781.665.0780 - TestEquipmentDepot.com