Page 13
990242 Rev. A
5
Installation and
Unit Checkout
After completing the operations in Section 4 you are now ready to begin
installation of your Kreativ
Mach 4.0
or
4.1.
Pre-Installation Requirements
1. Adequate Air Supply. Ensure that you have at least 80 PSI (550 kPa) @ 1.5 CFM
(42.5 l/m) of clean, dry air. (The ideal air for the
Mach
4.0
or
4.1
is obtained by
placing a "T" fitting prior to the final regulator at the operatory but after the dryer, traps
and various filters.)
2. Power supply with earth grounding.
NOTE:
Route the power cord safely out of the way and
do not use
an extension
cord.
Unit Checkout
•
Set the Power Switch on the front panel to OFF, and the POWDER FLOW knob
completely counter clockwise to the zero (0) position.
•
Connect the end of the air supply hose with the quick disconnect to the external air
supply.
•
Plug the power supply cord into a properly grounded receptacle.
•
Set the Power Switch to ON. The green pilot light should be illuminated.
Summary of Contents for Kreativ Mach 4.0
Page 10: ...Page 8 990242 Rev A...
Page 18: ...Page 16 990242 Rev A...