13
4.
Write the Welch Allyn RMA number with the Welch Allyn address on the outside of the shipping
carton.
Recommended service intervals
To confirm that the device is functioning within the design specifications, perform periodic service as
indicated below. Customers can perform the basic functional verification and calibration procedures
referenced below by following the instructions in this manual.
Routinely perform the following preventive maintenance to keep your scale in working
order.
1.
Check the calibration annually or as required.
2.
Inspect the cradle for cracks or loose or missing hardware. Replace or repair if necessary
3.
Inspect the scale’s enclosure for damage or loose or missing hardware. Replace or repair if
necessary.
4.
Inspect the power adapter cable for abrasions or other sign of wear.
5.
Do not expose the scale to excessive water or moisture.
6.
Do not store the scale where heavy objects can be placed on it.
7.
Replace the batteries annually or as required.
8.
Do not service or perform any maintenance while the scale is in use with a patient.
9.
When storing the scale, remove the batteries from the battery area. Batteries can corrode over a
period of time. Make sure to check the batteries before putting the scale back into use.
Summary of Contents for 5002 Series
Page 6: ...6 ...
Page 7: ...7 ...
Page 9: ...9 ...
Page 30: ...30 1 Remove handrail screws 6 and handrail 2 Remove mast bolts and washers 2 and mast ...
Page 51: ...51 Base Disassembly overview 6002 Base 5702 Base 5002 Base 6702 Base 6702W Base 6702SP Base ...
Page 91: ...91 10 Remove power jack mounting screws 2 and power jack ...
Page 112: ...112 Full Assembly Exploded Views 5002 ...
Page 115: ...115 5122 ...
Page 118: ...118 5702 ...
Page 121: ...121 6002 ...
Page 124: ...124 6702 ...
Page 127: ...127 6702W ...
Page 130: ...130 6702SP ...