Following servicing
Observe national regulations for soundness test of refrigerant circuit.
▶
Carry out visual inspection:
▪
check pipe connections,
▪
check refrigerant pipework and insulation for visible damage,
▪
complete insulation of refrigerant pipework.
▶
If necessary replace damaged refrigerant pipework and insulation.
▶
Check for leaks using a leak detecting device during operation.
▶
Carry out a function test.
▶
Document all work carried out on the engineers report.
▶
Mount the front panel and secure the tension lock with the screw.
Installation and operating instruction
Hydraulic unit WWP L 7 ... L 15
9 Servicing
83279602 • 1/2014-05 • La
38-59