A
Gas line must be vented completely to avoid
lockouts caused by the electronic compound
regulation when calibrating during operation
(messages F61, F62).
Conversion to Liquid Petroleum Gas
Gas nozzle replacement not required !
The following sequences hould be observed during
the conversion:
1. Switch boiler on/off switch to 0.
2. Unscrew plug for voltage supply to gas valve.
3. Turn setting screw (socket head 2.5 mm) on gas valve
to right stop. This requires approx. 30 rotations.
Natural Gas
: left stop
Liquid Petroleum Gas : right stop
4. Retighten plug for voltage supply to gas valve.
5. Switch on boiler.
6. In heating engineer level (
➩
Ch. 6.3) set parameter
P11 to F.
7. Carry out calibration using parameter 39 (see page
43).
8. Burner commissioning and O
2
check to Ch. 5.5.
9. Note setting of type of gas on name plate.
C
Reduction of heat rating
!!Gas rate adjustment!!
Procedure:
☞
In heating engineer level (
➩
Ch. 6.3.3)
set parameter P37 accordingly.
☞
Note reduced heat rating on name plate.
Gas type conversion
ATTENTION
Setting screw
socket head 2.5 mm
Max Weishaupt GmbH
D-88475 Schwendi
Nominal heat rate loading (heating)
reduced to max. __________kW
Summary of Contents for WTC 45-A
Page 75: ...75 A ...
Page 84: ...84 A 5 01 5 02 5 03 5 09 5 14 5 13 5 05 5 04 5 06 5 04 5 10 5 12 5 11 5 09 5 08 5 07 5 09 ...
Page 86: ...86 A 6 01 6 02 6 05 6 04 6 06 6 07 6 01 6 08 6 03 ...
Page 88: ...88 A ...
Page 89: ...89 A ...