![Weil-McLain HE (Series 2) Manual Download Page 25](http://html1.mh-extra.com/html/weil-mclain/he-series-2/he-series-2_manual_952747025.webp)
Part number 550-100-180/0917
25
&IGURE
Vent and air piping materials — Use only the materials listed below, ensuring that all materials meet local
codes (see Figure 96, page 105 for vent/air part/kit numbers)
Venting/combustion air — options
#ATEGORY)))6
SlimFit
®
Series 2
COMMERCIAL
CONDENSING
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
)TEMS
-ATERIAL
3UPPLIER-ANUFACTURER
5NITED3TATES
Canada
V
ent or air pipe and fittings
0OLYPROPYLENE
Duravent / M&G – Polypro
Certified for Category IV
and direct vent appliance
venting
Plastic vent pipe must be certified to
ULC S636 if required by local codes
Centrotherm Eco Systems – InnoFlue
®
Single-wall
Certified for Category IV
and direct vent appliance
venting
Plastic vent pipe must be certified to
ULC S636 if required by local codes
!,#
stainless
steel
Heat Fab, Inc. — Saf-T-Vent
®
Certified for Category IV
and direct vent appliance
venting
Certified for Category IV and direct vent
appliance venting
Z-Flex, Inc. — Z-Vent II
Certified for Category IV
and direct vent appliance
venting
Certified for Category IV and direct vent
appliance venting
Dura-Vent — FasNSeal™
Certified for Category IV
and direct vent appliance
venting
Certified for Category IV and direct vent
appliance venting
Metal-Fab, Inc. — CORR/GUARD
Certified for Category IV
and direct vent appliance
venting
Certified for Category IV and direct vent
appliance venting
06#3CHEDULE
See Note 1 for additional requirements for using PVC
on the exhaust.
See Note 2.
ANSI/ASTM D1785
Plastic vent pipe must be certified to
ULC S636 if required by local jurisdiction.
Air pipe can be any of those listed at left if
acceptable by local codes.
06#$763CHEDULE
See Note 1 for additional requirements for using PVC
on the exhaust.
See Note 2.
ANSI/ASTM D2665
Plastic vent pipe must be certified to
ULC S636 if required by local jurisdiction.
Air pipe can be any of those listed at left if
acceptable by local codes.
#06#3CHEDULE
See Note 2.
ANSI/ASTM F441
Plastic vent pipe must be certified to
ULC S636 if required by local jurisdiction.
Air pipe can be any of those listed at left if
acceptable by local codes.
0RIMERAND#EMENT
06#
ANSI/ASTM D2564
(cement)
ANSI/ASTM F656
(primer)
ULC S636 rated Primers and Cements
#06#
ANSI/ASTM F493
(cement)
Primer that is approved
for CPVC.
ULC S636 rated Primers and Cements
#06#TO06#TRANSITION
Use only a Primer and
Cement that is suitable
for joining CPVC and
PVC pipe.
ULC S636 rated Primers and Cements
Notes:
1.
PVC can only be used on the exhaust of a boiler after 10 linear feet of CPVC pipe. All fittings within the first 10 feet
must be CPVC. See Figure 23, page 26 .
2.
For CPVC/PVC , See Figure 96, page 105 for SlimFit adapters to connect boiler connection to CPVC/PVC pipe.
Every joint on vent and air piping must include a locking collar. Failure to supply locking collars could result in vent/air piping
leakage. All PVC and CPVC joints should be permanently joined using the suitable primer and cement for the vent material.
DO NOT USE
: Cellular core PVC (ASTM F891), cellular core CPVC, or Radel® (polyphenolsulfone) pipe or any other material
not listed in the table above.
DO NOT mix piping from different pipe manufacturers unless using adapters specifically designed for the purpose by the
manufacturer.