www.weg.net
26 | ABW - Air Circuit Breaker
1.8 RECEIPT INSPECTION
Immediately after receiving the product, check that its packaging is in a perfect state. Upon unpackaging it, execute
a visual inspection of the circuit breaker, even before removing it from the pallet. If there is any sign of damage or
flaws caused by the transportation, inform the carrier and WEG directly. Also check that the information appearing
on the product identification labels matches the item acquired.
1.9 STORAGE
If it is necessary to store the circuit breaker before installing it, maintain it in its original packaging, in a covered,
clean, dry, ventilated and heated place to avoid condensation. Maintain the circuit breaker in the OFF position,
with the springs unloaded. For Draw-out circuit breakers, maintain it in the TEST position. When it is no longer in
its original packaging, protect it from the dust or humidity covering it with a plastic film or covering. Do not store
the circuit breaker in an uncovered place or exposed to bad weather.
1.9.1 Maximum stacking
≤3
ABW06~40(3P)
≤2
ABW40(4P)
1
ABW50~63
Figure 1.17: Maximum stacking
Summary of Contents for ABW Series
Page 2: ......
Page 3: ...User Manual Series ABW Air Circuit Breaker Language English...
Page 4: ......
Page 7: ......
Page 56: ......
Page 57: ...Manual del Usuario S rie ABW Interruptor Abierto Idioma Espa ol...
Page 58: ......
Page 61: ......
Page 110: ......
Page 111: ...Manual do Usu rio S rie ABW Disjuntor Aberto Idioma Portugu s...
Page 112: ......
Page 115: ......
Page 160: ...160 ABW Disjuntor Aberto www weg net 6 5 PR ALARME Figura 6 5 Pr alarme...