Air Top Evo 40 / Air Top Evo 55
Mechanical system
91
11
Initial start-up
After you have installed the heater, bleed the fuel supply system carefully.
11.1. Installation / initial operation of the Air Top Evo system
Installation
1.
Installation of heaters according to the installation instructions
2.
Ensure that the electrical connections are in accordance with the system
wiring diagram (Fig. 37, Fig. 38)
3.
Installation of the control element and external temperature sensor
12
Faults
If an error occurs, a flash code is displayed in the operation indicator or an
error message is displayed on the combination timer.
Proceed in accordance with the workshop manual to eliminate an error.
NOTE:
The safety precautions in the operating instructions must be
observed!
The operating instructions must be read through without fail
before starting the heater.
NOTE:
The system is configured automatically as master and slave
when the heater is switched on.
Summary of Contents for Air Top Evo 40B
Page 2: ......
Page 53: ...Technische Information Air Top Evo 40 Air Top Evo 55 48...
Page 101: ......