TT-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
28 of 198
3.
The hook la
b
eled #1 is attached to the eye
b
olt
la
b
eled #1.
4.
Remo
v
e the lag
b
olts attaching the air handler
to the skid and discard.
5.
Begin to lift slo
w
ly; readj
u
stment of the offset
chain may
b
e req
u
ired. After
u
nit is s
u
spended
and free from the skid, remo
v
e the skid. The air
handler
w
ill
b
e hanging at a slight angle.
6.
Set the lo
w
est edge do
w
n slo
w
ly on a protec-
ti
v
e s
u
rface s
u
ch as ply
w
ood.
7.
Contin
u
e to lo
w
er the air handler into the
proper position horizontally. The
u
nit can no
w
b
e rigged for installation.
FIGURE 23: Reposition for Liftin
g
TT112 - TT21
8
2
1
Example of chain
Lifting Ring
Adjustable Hooks
Lifting Hook With
Safety Locks
1
2
Lowest Corner
Lower
prevent damage.
Plywood
take the weight off to
mech. means. Need to
Raise slightly by hand or
Summary of Contents for TT Series
Page 2: ......
Page 4: ......
Page 136: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 130 of 198 FIGURE 114 Regulator RV61 ...
Page 167: ...SECTION27 TROUBLESHOOTING 161 of 198 ...
Page 175: ...SECTION27 TROUBLESHOOTING 169 of 198 ...
Page 177: ...SECTION27 TROUBLESHOOTING 171 of 198 ...
Page 198: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 192 of 198 ...
Page 202: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 196 of 198 ...
Page 203: ...SECTION 28 THE WEATHER RITE TT SERIES WARRANTY 197 of 198 ...
Page 204: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 198 of 198 ...