SECTION 25: M
AINTENANCE
133 of 198
SECTION 25: MAINTENANCE
Prior to any maintenance or ser
v
ice to the air handler, sh
u
t off, locko
u
t and tago
u
t the electrical disconnect
and f
u
el
v
al
v
e that s
u
pplies the
u
nit in accordance
w
ith OSHA reg
u
lations and allo
w
ample time for the air
handler to cool. After maintenance is performed or
u
nit is ser
v
iced, the
u
nit shall
b
e re-commissioned to the
start-
u
p proced
u
re as o
u
tlined on
Page 122, Section 24
.
DANGER
Failure to follow these instructions can result in death, injury or property damage.
Severe Injury Hazard
Do not enter equipment while in operation.
Equipment may start automatically.
Do not operate with door open.
Installation, operation and service must be
done by a trained technician only.
Electrical Shock Hazard
Disconnect electric before service.
More than one disconnect switch may be
required to disconnect electric from
equipment.
Equipment must be properly grounded.
Summary of Contents for TT Series
Page 2: ......
Page 4: ......
Page 136: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 130 of 198 FIGURE 114 Regulator RV61 ...
Page 167: ...SECTION27 TROUBLESHOOTING 161 of 198 ...
Page 175: ...SECTION27 TROUBLESHOOTING 169 of 198 ...
Page 177: ...SECTION27 TROUBLESHOOTING 171 of 198 ...
Page 198: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 192 of 198 ...
Page 202: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 196 of 198 ...
Page 203: ...SECTION 28 THE WEATHER RITE TT SERIES WARRANTY 197 of 198 ...
Page 204: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 198 of 198 ...