Maintaining Proper Instrument Grounding
Both 120VAC and 230VAC power sources require an earth ground at the power connection. Failure to provide this
safety ground could result in improper measurements and/or electrical shock danger to the operator.
Only qualified service personnel should perform maintenance procedures on the OE-2. When maintenance is
performed, NO protective earth ground connections should be removed.
NOTE: Where this product is installed at areas requiring main power connections other than the three-pronged
North American power plug, the main power cord must be replaced with the cord and plug appropriate to the
location. The main supply cord must be rated to meet or exceed the current rating on the IEC connector (10 amps)
and must meet the requirements of H05VV power cords in IEC 227 or IEC 245. If the appropriate power cord
cannot be obtained locally, contact the
WAVECREST
Corporation
factory and one will be provided.
Fuse Replacement
The IEC plug-in at the back of the OE-2 provides the input connection for the AC power cord. A small compartment
on the IEC plug houses two Wickman 2AT/250V fuses (5x20mm). To gain access to the fuses, remove the power to
the OE-2 and disconnect the power cord. With a small screwdriver, pry open the fuse compartment on the IEC plug.
Remove the fuses and install the new fuses prior to closing the compartment and reinstalling the power cord.
Cleaning Instructions
Periodic cleaning of the OE-2 cabinet may be required. Use a clean, lint-free cloth to dust outer surfaces after
electrical power has been removed. If needed, dampen cloth with light amounts of water or alcohol.
Intended Use Of Equipment
The OE-2 should be used only for its intended purpose as outlined in this manual. To avoid possible injury, the OE-
2 should not be operated with the top cover or other panels removed. Refer installation and maintenance to qualified
service personnel.
To avoid explosion, do not operate the OE-2 in or near an atmosphere of explosive gases
| APPENDIX A | Specifications
22