background image

RECOMMENDED REPLACEMENT PARTS AND CHANGE INTERVALS:

Depending on incoming feed water conditions replacement time frame may vary.

Change Time  

Description 

 

6 months:  

Sediment Pre-filter (104017);  Carbon Pre-filters (101009) 

12 months 

Final Carbon filter (100017)

This system has been tested according to NSF/ANSI 58 for reduction of the substances below.  The concentration of the indicated substances in 

water entering the system was reduced to a concentration less than or equal to the permissible limit for water leaving the system as specified in 

NSF/ANSI 58.  This system has been tested for the treatment of water containing pentavalent arsenic (also known as As (V), As (+5), or arsenate) 

at concentrations of 0.30 mg/L or less.   This system reduces pentavalent arsenic, but may not remove other forms of arsenic.  This system is to 

be used on water supplies containing a detectable free chlorine residual at the system inlet or on water supplies that have been demonstrated to 

contain only pentavalent arsenic.  Treatment with chloramine (combined chlorine) is not sufficient to ensure complete conversion of trivalent arsenic 

to pentavalent arsenic.  Please see the Arsenic Facts section of the installation manual for further information.

 

Avg. In. 

Avg. Eff. 

% Reduction  pH 

Pressure  Max Eff.  Inf. challenge 

Max Allowable

 

 

 

     

concentration 

concentration

 

 

 

      mg/L 

mg/L

Arsenic (Pentavalent)  334.615 ug/L  5.0385 ug/L 

98.4% 

 

50psi 

19 ug/L 

   0.30±10% 

0.010

Barium Reduction 

10.2 mg/L 

0.207 mg/L 

97.9% 

7.24 

50psi 

0.3 mg/L 

   10.0±10% 

 2.0

Cadmium Reduction 

0.036 mg/L  0.0005 mg/L 

98.6% 

7.49 

50psi 

0.0007 

    0.3±10% 

0005

Chromium (Hexavalent)  0.15 mg/L 

0.013 mg/L 

91.3% 

7.24 

50psi 

0.03 

    0.3±10% 

0.1

Chromium (Trivalent) 

0.17 mg/L 

.01 mg/L 

94.1% 

7.24 

50psi 

0.01 

    0.03±10% 

0.1

Copper Reduction 

3.1 mg/L 

0.03 mg/L 

99.0% 

7.64 

50psi 

0.04 

    3.0±10% 

1.3

Fluoride Reduction 

8.0 mg/L 

0.5 mg/L 

93.9% 

7.49 

50psi

 

0.7 

    8.0±10% 

1.5    

Lead Reduction 

0.15 mg/L 

0.002 mg/L 

98.6% 

7.49 

50psi 

0.003 

    0.15±10% 

0.010

Radium 226/228 

25 pCi/L 

5 pCi/L 

80.0% 

7.24 

50psi 

5 pCi/L 

    25pCiL±10% 

5 pCi/L

Selenium 

0.10 

0.008 

92.0% 

 

50psi 

0.011 

    0.10±10% 

0.05

Turbidity 

10.2 mg/L 

0.26 mg/L 

97.5% 

 

 

0.83 

    11±1 NTU 

0.5 NTU

 

RECOVERY - 16.75% 

 

GALLONS - 24.8 GPD 

 

EFFICIENCY - 12.0%

Efficiency rating means the percentage of the influent water to the system that is available to the user as reverse osmosis treated water under operating 

conditions that approximate typical daily usage.

 

Recovery rating means the percentage of the influent water to the membrane portion of the system that 

is available to the user as reverse osmosis treated water when the system is operated without a storage tank or when the storage tank is bypassed. 

There is an average of 4 gallons of reject water for every 1 gallon of product water produced. Testing performed under standard laboratory conditions, 

actual performance may vary. Refer to owners manual for further maintenance requirements and warranty information.

Phone: (480) 675-7995 

 

        Fax: (623) 866-5666   

              www.PremierH2o.com

GENERAL USE CONDITIONS:

1. System to be used with municipal or well water sources treated and tested on regular basis to insure bacteriological safe quality.  Do not use 

with water that is microbiologically unsafe or unknown quality without adequate disinfection before and after the system.  Systems certified for cyst 
reduction may be used on disinfected water that may contain filterable cysts.

2. Operating Temperature: 

 

 

Maximum: 100°F (40.5°C) 

 

 

Minimum: 40° (4.4°)

3. Operating Water Pressure:   

 

Maximum: 100 psi (7.0kg/cm2) 

 

Minimum: 40 psi (2.8kg/cm2)

4. 

pH 

    2 

to 

11

5. Hardness of more than 10 grains per gallon (170 ppm) may reduce TFM membrane life expectancy.

6. Recommend TDS (Total Dissolved Solids) not to exceed 1800 ppm.

Watts Premier

 8716 W Ludlow Drive Suite #1

Peoria, AZ 85381

480) 675-7995

Performance Data Sheet

ZRO-4 ZeroWaste

®

 RO

14

3 to 5 years  

R.O. Membrane (110009) 

Summary of Contents for ZRO-4

Page 1: ...r operating parameters may lead to the product s failure Save manual for future reference Model ZRO 4 ZEROWASTE REVERSE OSMOSIS SYSTEM Premier Inc 8716 W Ludlow Drive Suite 1 Peoria AZ 85381 Phone 800 752 5582 www PremierH2o com Fax 623 866 5666 System is in compliance with the Uniform Plumbing Code UPC International Plumbing Code IPC and IGC 159 2000A ...

Page 2: ...ation systems alone Your system is a four stage RO which is based upon separate treatment segments within the one complete water filtration system These stages are as follows Stage 1 Sediment filter recommended change 6 months The first stage of your RO system is a five micron sediment filter that traps sediment and other particulate matter like dirt silt and rust which affect the taste and appear...

Page 3: ...ill a Hole for the Faucet in a Porcelain Sink 5 Punch a Hole for the Faucet in a Stainless Steel Sink 5 Installation of Faucet 6 Connect Blue Tube from the RO to the Fuacet 6 Adapt a Valve Installation 7 Connect the Green and Black Tubing 7 Mounting the RO Module 7 Tank Ball Valve Installation 7 Blue Tube Connection From the RO Module to TANK 8 Start up Instructions 8 6 Month System Maintenance 9 ...

Page 4: ...comply with State and local plumbing regulations This system is to be installed to treat cold water only Copper Tubing Reverse Osmosis water should not be run through copper tubing as the purity of the water will leach copper causing an objectional taste in water and pin holes may form in the tubing Premier supplies speciality filters part number 107008 that can be used if copper tubing follows th...

Page 5: ...ep 5 The faucet can now be installed If mounting faucet to a Stainless Steel Sink you will need a 1 2 minimum hole punch The faucet opening should be centered between the back splash and the edge of the sink ideally on the same side as the vertical drain pipe Note Note Most sinks are pre drilled with 1 or 1 diameter hole that you can use for your RO faucet If you are already using it for a sprayer...

Page 6: ...ghten brass nut securely Connect Blue Tube from the RO to the Faucet Step 9 Locate the blue 1 4 tube attached to the RO module labeled Faucet Remove a brass nut plastic sleeve and brass insert from the parts bag To assemble place the brass nut on the blue tube first then the sleeve small tapered end of sleeve must point to the end of tube and then push the brass insert all the way into the end of ...

Page 7: ...ubing attached to the RO system Insert the open end of the green 1 4 tube into the open 1 4 quick connect fitting on the COLD water feed adapta a valve making sure the tube is pushed in all the way to the tube stop Repeat the procedure to connect black tubing from the RO module to the hot water return adapt a valve Mounting the RO Module Determine the best location for the RO Module to be mounted ...

Page 8: ...drip Then close the faucet The tank will take approximately 4 hours to fill Note If no water comes out of the RO faucet after a few minutes check the power outlet It is possible that the power outlet you used for the RO unit is controlled by the garbage disposal switch To test Unplug the garbage disposal and flip the garbage disposal switch to on If the RO pump turns on and water starts to drip ou...

Page 9: ...d soap solution and rinse with water Check O rings and lubricate with water soluble lubricant KY Jelly or other water based lubricants may be used Petroleum based lubricants such as Vaseline must not be used Step 5 Before re installing the filter bowls back on to the system check O rings to make sure they are still in place Caution Insert a new sediment filter cloth like appearance into the 1st fi...

Page 10: ...leach to dilute Step 5 Let the system sit idle for 1 minute Step 6 Drain the system completely Step 7 Let the system fill again approximately 8 minutes and sit idle for 10 minutes before draining the system again Step 8 Turn off the incoming water at the adapt a valve and open the faucet to make sure all the water has been drained Step 9 Open the membrane housing and re install the RO membrane whi...

Page 11: ...mpletely empty Step 3 Disconnect the green tube from the elbow on the end cap of the membrane housing Removing the membrane Step 4 Remove the end cap from the membrane housing by turning it counter clockwise to loosen Step 5 Using a pair of pliers grip the PVC tube of the RO membrane and pull firmly on the membrane to remove from the housing and discard Installing the membrane Step 6 Lubricate the...

Page 12: ...leaks at the top after Damaged Dry O ring Lubricate with water soluble lubricant or replace changing the filters O ring as necessary Do not use Vaseline or other petroleum based lubricants Pump constantly running Electrical fault Call for technical support Faucet left on Close faucet and let tank fill for 2 to 3 hours Plugged pre filters Replace filters 12 Once all water in the tank is purged chec...

Page 13: ...rd Step 2 Lever will slide forward and completely off of the faucet base Step 3 Small brass tee can be turned 1 2 turn counterclockwise to adjust the tension on the black lever This adjustment may be necessary to stop slow drips from tip of faucet You may need to repeat the process until the faucet does not drip Brass tee must always end up facing across body of faucet in order to slide black leve...

Page 14: ...Reduction 8 0 mg L 0 5 mg L 93 9 7 49 50psi 0 7 8 0 10 1 5 Lead Reduction 0 15 mg L 0 002 mg L 98 6 7 49 50psi 0 003 0 15 10 0 010 Radium 226 228 25 pCi L 5 pCi L 80 0 7 24 50psi 5 pCi L 25pCiL 10 5 pCi L Selenium 0 10 0 008 92 0 50psi 0 011 0 10 10 0 05 Turbidity 10 2 mg L 0 26 mg L 97 5 0 83 11 1 NTU 0 5 NTU RECOVERY 16 75 GALLONS 24 8 GPD EFFICIENCY 12 0 Efficiency rating means the percentage o...

Page 15: ...nge trivalent arsenic to pentavalent arsenic A combined chlorine residual also called chloramine may not convert all the trivalent arsenic If you get your water from a public water utility contact the utility to find out if free chlorine or combined chlorine is used in the water system This Premier reverse osmosis system is designed to remove pentavalent arsenic It will not convert trivalent arsen...

Page 16: ...16 ...

Page 17: ...10115 BLACK TUBING 1 4 X 3 1 2 45 610117 BLACK TUBING 1 4 X 4 46 610113 BLUE TUBING 1 4 X 4 47 610109 GREEN TUBING 1 4 X 4 Item Part Description 1 116023 FAUCET AG CHROME 2 134018 VALVE BALL PLAS ELB 4 119007 TANK PRESS 3 GAL WHITE 5 119028 TANK STAND 6 125017 CON PL 1 4C X 1 4M 7 100017 GAC IL 10 1 4F 8 125064 TEE MALE RUN 1 4 X 1 4 M 9 152032 SWITCH PRESSURE 60 PSI TSO 10 164010 CLIP DOUBLE MEM ...

Page 18: ...RVICE RECORD DATE OF PURCHASE DATE OF INSTALL INSTALLED BY SERIAL NO NAME Date of 6 mos 6 mos 1 yr 2 5 yrs OTHER Maintenance 1st stage 2nd stage Final Filter TFM Memb Sediment Carbon Block Carbon NOTES 18 ...

Page 19: ...rees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do not use with water that is micro biologically unsafe or of unknown quality without 9 adequate disinfection before or after the system This warranty does not cover any equipment that is relocated from the site of its original installation This warranty does not cover any charges incurred due to professional instal...

Reviews: