background image

8

Lamp and Quartz Sleeve Replacement Procedure

 

1.  Disconnect the power supply from the wall outlet.
2.  Turn off the inlet valve and outlet isolation valves.
3.   Loosen the Phillips set screw on the quartz sleeve nut and 

separate the nut into its two halves by pulling on the back 

half of the nut.

4.   Carefully withdraw lamp approximately 2 inches from cham-

ber and disconnect the lamp lead wire from lamp. Remove 

the lamp from the UV chamber. If not replacing the quartz 

sleeve proceed to step 11.

5.  De-pressurize the system.
6.   Grip the quartz sleeve nut with your hand and unscrew coun-

ter clockwise until it can be disconnected from the reactor 

chamber's threaded port.

7.  Remove the quartz sleeve from the reactor chamber.
8.    Fully insert a new quartz sleeve into the reactor chamber. Be 

careful not to force the quartz sleeve, breakage may occur. 

Then install the o-ring over the quartz sleeve.

9.    Install the quartz sleeve nut onto the threaded port of the 

reactor chamber. Screw the quartz sleeve nut on clockwise 

and tighten hand tight.

10.  Turn on the inlet valve and check for leaks. Repair leaks as 

needed.

11. Insert a new lamp into the quartz sleeve.
12.  Reconnect the lamp lead wire to the new lamp and press 

the chamber nut’s two halves back together. Then tighten 

the Phillips set screw.

13. Restore power to the system.
14. Verify LED Indicator is green.
Immediately after replacement of the UV lamp, and/or quartz 

sleeve, follow the disinfection procedure within this manual.

If any water comes in contact with any electri-

cal components, dry the components immedi-

ately. 

DO NOT

 energize a system with damp 

or wet electrical components.

WARNING

!

120 Volt Lamp Connection

230 volt Lamp Connection

Summary of Contents for SmartStream UV WA002

Page 1: ...ty damage or damage to the equipment Keep this Manual for future reference WARNING Installation Precautions 2 System Specifications 3 Product Specification Tables 4 Dimensions 4 Feed Water Requirements 5 Installation Procedure 5 Installation Diagram 6 Maintenance 7 Parts List 7 Lamp and Quartz Sleeve Replacement 8 Disinfection Procedure 9 Troubleshooting 9 Warranty and Conditions 10 Table of Conte...

Page 2: ...ream system Be certain that the feed water meets all criteria within the Feed Water Specifications section of this manual WARNING Installation Guidelines DO NOT allow this system to remain ON with out water in it for extended periods of time DO NOT install the system near any source of heat Also DO NOT install the system near any device or break out area that would be adversely effected by water D...

Page 3: ...he system requires servicing SmartStream UV System Part Number Identification Key Prefix W Controller Series GPM Connection Type Pipe Size Plug Accessories Watts Controller Type A Controller A GPM of System 3 Digits Connection Port Types A NPT B BSP Tapered Pipe Size B 3 8 C 1 2 D 3 4 E 1 A North American 120V B European 220V Accessories X No Accessories Green Red LED Indicator System Features A S...

Page 4: ...Red LED AUDIBLE ALARM Yes AUDIBLE ALARM MUTE No MIN MAX AMBIENT AIR TEMPERATURE MAX HUMIDITY 32 F 0 C to 122 F 50 C 90 RH non condensing INLET WATER TEMPERATURE RANGE 36 F 2 C to 104 F 40 C MAX WATER PRESSURE 100 psi 689 kPa SHIPPING WEIGHT 4 6 lbs 2 1 Kg 6 4 lbs 2 9 Kg 8 lbs 3 7 Kg 11 lbs 5 Kg Dimensions A Series UV Systems Model GPM A B C D E F WA002 2 1 1 14 17 17 65 3 83 3 09 14 WA006 6 1 2 22...

Page 5: ...ith a paper towel 15 Loosen the Phillips set screw on the side of the quartz sleeve nut and separate the nut from the power cord 16 Install the quartz sleeve nut o ring onto the visible end of the quartz sleeve Screw the quartz sleeve nut onto the quartz sleeve port thread and tighten hand tight 17 Install the ultraviolet lamp into the quartz sleeve DO NOT touch the lamp with your fingers Hold it ...

Page 6: ...6 Typical Installation Diagram ...

Page 7: ...VQS6 UV QUARTZ SLEEVE FOR 6 GPM 530MM X 24 5MM A SERIES 2c 1 WUVQS8 UV QUARTZ SLEEVE FOR 8 GPM 680MM X 24 5MM A SERIES 2d 1 WUVQS12 UV QUARTZ SLEEVE FOR 12 GPM 910MM X 24 5MM A SERIES 3 1 HSFSUVOR UV QUARTZ SLEEVE O RING FOR A SERIES 4a 1 WUVLAMP2 UV LAMP FOR 2 GPM A SERIES 4b 1 WUVLAMP6 UV LAMP FOR 6 GPM A SERIES 4c 1 WUVLAMP8 UV LAMP FOR 8 GPM A SERIES 4d 1 WUVLAMP12 UV LAMP FOR 12 GPM A SERIES ...

Page 8: ...artz sleeve into the reactor chamber Be careful not to force the quartz sleeve breakage may occur Then install the o ring over the quartz sleeve 9 Install the quartz sleeve nut onto the threaded port of the reactor chamber Screw the quartz sleeve nut on clockwise and tighten hand tight 10 Turn on the inlet valve and check for leaks Repair leaks as needed 11 Insert a new lamp into the quartz sleeve...

Page 9: ... connection Low pressure after system Clogged prefilter Replace prefilter Quartz sleeve nut leaks Quartz sleeve nut loose Tighten quartz sleeve nut O ring is defective Replace o ring All problem conditions called out within this troubleshooting chart require the disinfection procedure to be conducted after the corrective action has been completed NOTICE 1 Shut off the isolation valves on the cartr...

Page 10: ...hed installation and operation manual product specifi cation sheet and local plumbing codes This product must be installed in connection with an approved water supply This product must be operated at water pressures and temperatures that do not exceed the Company s published specifications This product is limited to use within atmospheric environments indoors that are within ambient temperature li...

Reviews: