Benchmark 5000-6000 Boiler Installation & Startup Manual
SECTION 2:
INSTALLATION
OMM-0123_E
• GF-207 • 12/17/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
26
of
95
2.11 FIELD CONTROL WIRING
Each unit is fully wired from the factory with an internal operating control system. No field control
wiring is required for normal operation. However, the C-More Controller used with all
Benchmark units does allow for some additional control and monitoring features. Wiring
connections for these features are made on the Input/Output (I/O) board located behind
unit’s
removable front panel. The I/O board is located in the I/O Box. The I/O board terminal strip
connections are shown in Figure 2-14. All field wiring is installed from the rear of the panel by
routing the wires through one of the four bushings provided on the sides of the I/O box.
Figure 2-13a: Input/Output (I/O) Box Location
Figure 2-13b: Input/Output (I/O) Box
–
Cover Removed
WARNING!
DO NOT make any connections to the I/O Box terminals labeled “
NOT USED
”. Attempting to
do so may cause equipment damage.
I/O PCB
BOARD
TERMINAL STRIPS